100 York Road, 110 York Road and Car Park to Rear SW11 3RD Data via plota.co.uk

Approved 2025/3187 - Variation of Condition
Date received
11 Sept 2025
Date validated
30 Sept 2025
Decision date
8 Apr 2026
Postcode
SW11 3RD
Type
Variation of Condition

Description

Variation of conditions 2 (in accordance with approved drawings) and 28 (number Data via plota.co.uk

Last checked

Planning committee

Decided by Wandsworth Planning Applications Committee on 20 Jan 2026.

Approved unanimously

As officers recommended.

  • Officers advised approval because the changes were minor, acceptable in design and accommodation, and caused no material additional harm.
  • Two neighbours objected over congestion, parking, utilities, noise, dust and disruption; one response supported fewer units and a family-sized home.
  • The committee unanimously granted permission, subject to CIL liability and a legal agreement under section 106.
Read how the committee decided The proposed unit changes, site background, officer assessment, consultation, committee discussion and decision.

Source: Plota analysis of Wandsworth's committee minutes of 20 Jan 2026.

Associated applications 13

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Wandsworth AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Inside the Wandsworth built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space 40 m away.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 12 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wandsworth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Wandsworth
Planning Authority Score
4.8/10
Below average
#164 of 296 councils
Relevant to this application:
Householder decisions

Wandsworth ranks #172 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Wandsworth decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #120 of 296
92%
Householder approved
Above avg (90%) #168 of 296
62%
Decided in 8 weeks
Below avg (63%) #172 of 296
37%
Extended time limit
Below avg (41%) #124 of 296
89%
Minor dwellings approved
680 decided (1-9 homes)
81%
Major dwellings approved
16 decided (10+ homes)
72%
Change of use approved
36 decided
2,062
Total decisions
206 refused in the year to March 2026