Land To The West Of, Michigan Avenue, Salford, M50 2GY Data via plota.co.uk

OTH/2026/0686 - Discharge of condition follow on Decided

Proposal

Request for confirmation of compliance of condition 13 (landscaping) attached to planning permission (follow up to OTH/2026/0100) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 May 2026
✓
Condition Request determined
15 Sept 2026

Condition Request determined on 15 Sept 2026 · Delegated Decision · Last checked 24 Sept 2026

Documents 31

Plans & drawings 29

PDF Typical Details _ Furniture Details 02 Plans · 11 Sept 2026 View ↗ PDF Condition 13 - Planting plan D Plans · 25 Aug 2026 View ↗ PDF Condition 13 - Typical Details Interface Details Plans · 25 Aug 2026 View ↗ PDF Condition 13 - Edgings Plans · 25 Aug 2026 View ↗ PDF Condition 13 - Play Area GA Plans · 25 Aug 2026 View ↗ PDF Condition 13 - General Arrangement (Temporary Works) Plans · 25 Aug 2026 View ↗ PDF Condition 13 - Interface Location Plan Plans · 25 Aug 2026 View ↗ PDF Condition 13 - Furniture Details 01 Plans · 25 Aug 2026 View ↗ PDF Condition 13 - Softworks Plans · 25 Aug 2026 View ↗ PDF Condition 13 - Planting plan B Plans · 25 Aug 2026 View ↗ PDF Condition 13 - Hardworks Details Plans · 25 Aug 2026 View ↗ PDF Condition 13 - Hardworks Plans · 25 Aug 2026 View ↗ PDF Condition 13 - General Arrangement Plans · 25 Aug 2026 View ↗ PDF Condition 13 - Furniture and Boundary Treatments Plans · 25 Aug 2026 View ↗ PDF Condition 13 - Planting plan C Plans · 25 Aug 2026 View ↗ PDF Condition 13 - External Works Specification Plans · 25 Aug 2026 View ↗ PDF Condition 13 - Planting plan A Plans · 25 Aug 2026 View ↗ PDF Condition 13 - Raised Planter Details Plans · 25 Aug 2026 View ↗ PDF Condition 13 - Gate and Railing Detail Plans · 25 Aug 2026 View ↗ PDF Condition 13 - Furniture Details Plans · 25 Aug 2026 View ↗ PDF Condition 13 - Softworks Plans · 30 Jul 2026 View ↗ PDF Typical Details _ Gate and Railing Details Plans · 10 Jun 2026 View ↗ PDF Condition 13 - External Lighting Strategy Plans · 13 May 2026 View ↗ PDF Condition 13 - General Arrangement Plans · 13 May 2026 View ↗ PDF General Arrangement (Temporary Works) Plans · 13 May 2026 View ↗ PDF Condition 13 - Furniture and Boundary Treatments Plans · 13 May 2026 View ↗ PDF Condition 13 Typical Details S278 Typical Tree Pit Details Plans · 13 May 2026 View ↗ PDF Condition 13 - Softworks Plans · 13 May 2026 View ↗ PDF Condition 13 - Hardworks Plans · 13 May 2026 View ↗

All documents on the council site ↗

Associated applications 17

Site constraints 4

Article 4 direction
2018 HMO Article 4 Direction. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Also on the record
Nature recovery project: Lost Wetlands; Inside the Salford built-up area; Air quality management area about 15 m away: Salford AQMA.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 24 September 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Salford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Salford
Application type
Discharge of condition follow on
Postcode
M50 2GY
Received
13 May 2026
Validated
13 May 2026
Ward
Quays Ward
Target decision
10 Jun 2026
Decision
Condition Request determined
Decision date
15 Sept 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Elliott Bullock

Public comments

No public comments yet.

Last counted 24 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
20 Sept 2026
Salford
Planning Authority Score
3.9/10
Below average
#200 of 296 councils
Relevant to this application:
Householder decisions

Salford is slower than most councils at deciding householder applications, ranking #206 out of 296. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Salford decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #115 of 296
95%
Householder approved
Above avg (90%) #90 of 296
56%
Decided in 8 weeks
Below avg (63%) #206 of 296
53%
Extended time limit
Above avg (41%) #243 of 296
70%
Minor dwellings approved
40 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
77%
Change of use approved
75 decided
737
Total decisions
76 refused in the year to March 2026