Rooms Inc 125 High Street Maldon Essex CM9 5BS Data via plota.co.uk
Proposal
External flue extract for restaurant. Internal alterations to create toilets to restaurant and door to first floor apartment. Ground floor retail unit with 1 bedroom apartment behind. Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicts a decision around 30 Oct 2026, from Maldon's recent changes of use.
Site constraints 6
Show the other 14 with distances
- 16 m117, 119, 119a, 121, High StreetGrade II
- 28 m131, High StreetGrade II
- 43 m111, 111A AND 113, HIGH STREET (See details for further address information)Grade II
- 61 mRose and Crown Public HouseGrade II
- 71 m107, High StreetGrade II
- 72 m114, 114a, 116, 116a, High StreetGrade II
- 80 m105, High StreetGrade II
- 86 mMaldon Quaker Meeting HouseGrade II
- 90 m101 and 103, High StreetGrade II
- 91 mBloomfieldsGrade II
- 97 m89, High StreetGrade II
- 110 m140, High StreetGrade II
- 116 m142, High StreetGrade II
- 122 m144, High StreetGrade II
Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Building
From the energy performance certificate lodged in February 2025, the latest held for this property. The building may have changed since. View the certificate
Every application in Maldon - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
Nearby new applications
Maldon Resource Centre Chapter House Carmelite Way Maldon Essex CM9 5FX
Proposed installation of replacement heating plant (Air Source Heat Pump) and in...
Fulmar House 3A Fullbridge Maldon Essex CM9 4LE
T1 - Mature Sycamore Tree - Crown Reduction by up to 3m
89 Wantz Road Maldon Essex CM9 5DB
Two storey rear extension.
Amphitheatre The Promenade Park Park Drive Maldon Essex
T94 - Silver Birch - Cut Ivy from base to 1m, T95 - Lime - Remove Ivy and hedge ...
35A North Street Maldon Essex CM9 5HH
Demolition of the existing outbuilding. Erection of a two storey rear extension ...
154 Wantz Road Maldon Essex CM9 5DG
Demolish existing rear single storey structure and replace with 2 storey structu...
Important details
Decision outlook
Day 54 of the 56-day target. Maldon usually decides changes of use by day 56.
Plota live figures for changes of use decided by Maldon in the last twelve months, from validation. Maldon decision record →
Public comments
No public comments yet.
Last counted 27 Oct 2026
Consultation & key dates
- Alt. reference
- PP-14980516
- Planning Portal ref
- PP-14980516
- Consultation
- 1 Sept 2026
- Comments by
- 14 Oct 2026
- Site or press notice
- 23 Sept 2026
- Statutory expiry
- 30 Oct 2026
- Env. assessment
- No
Historical activity at this location
31 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
Maldon is slower than most councils at deciding householder applications, ranking #204 out of 296. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).
Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.
Track this application
Rooms Inc 125 High Street Maldon Essex CM9 5BS
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.

The consultation period closed on 14 Oct 2026.