Thameside Energy Recovery Facility Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7NU Data via plota.co.uk

26/01047/CONDC - Condition Clearance Pending

Proposal

Application for the approval of details reserved by condition no. 33 (Drainage Scheme) of the deemed planning permision (ref. 12.04.09. - as varied) for the construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks (Tilbury Green Power). Condition previosuly dischared in condition clearnce application Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
4 Sept 2026
Validated
8 Sept 2026
Decision
Expected by 3 Nov 2026

This application is under consideration - no decision has been issued yet. A decision is expected by 3 Nov 2026.

Documents 29

Statements & assessments 21

PDF DRAINAGE DESIGN SUMMARY Studies and Reports · 4 Sept 2026 View ↗ PDF PROCESS DRAINAGE DETAILS SHEET 1 Current Plan · 4 Sept 2026 View ↗ PDF COMBINED DRAINAGE LAYOUT (SHEET 2) Current Plan · 4 Sept 2026 View ↗ PDF PROCESS DRAINAGE LAYOUT (OVERALL) Current Plan · 4 Sept 2026 View ↗ PDF COMBINED DRAINAGE LAYOUT (SHEET 1) Current Plan · 4 Sept 2026 View ↗ PDF SITE WIDE DRAINAGE LAYOUT Current Plan · 4 Sept 2026 View ↗ PDF DRAINAGE DETAILS SHEET 6 Current Plan · 4 Sept 2026 View ↗ PDF SITE WIDE DRAINAGE DETAILS SHEET 5 Current Plan · 4 Sept 2026 View ↗ PDF SITE WIDE DRAINAGE DETAILS SHEET 4 Current Plan · 4 Sept 2026 View ↗ PDF SITE WIDE DRAINAGE DETAILS - SHEET 2 Current Plan · 4 Sept 2026 View ↗ PDF SITE WIDE DRAINAGE DETAILS - SHEET 3 Current Plan · 4 Sept 2026 View ↗ PDF PROCESS DRAINAGE DETAILS SHEET 10 Current Plan · 4 Sept 2026 View ↗ PDF SITE WIDE DRAINAGE DETAILS SHEET 1 Current Plan · 4 Sept 2026 View ↗ PDF PROCESS DRAINAGE DETAILS SHEET 9 Current Plan · 4 Sept 2026 View ↗ PDF PROCESS DRAINAGE DETAILS SHEET 8 Current Plan · 4 Sept 2026 View ↗ PDF PROCESS DRAINAGE DETAILS SHEET 3 Current Plan · 4 Sept 2026 View ↗ PDF PROCESS DRAINAGE DETAILS SHEET 7 Current Plan · 4 Sept 2026 View ↗ PDF PROCESS DRAINAGE DETAILS SHEET 5 Current Plan · 4 Sept 2026 View ↗ PDF PROCESS DRAINAGE DETAILS SHEET 4 Current Plan · 4 Sept 2026 View ↗ PDF PROCESS DRAINAGE DETAILS SHEET 6 Current Plan · 4 Sept 2026 View ↗ PDF PROCESS DRAINAGE DETAILS SHEET 2 Current Plan · 4 Sept 2026 View ↗

All documents on the council site ↗

Site constraints 2

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Also on the record
Inside the Tilbury built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Thurrock - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Thurrock
Application type
Condition Clearance
Postcode
RM18 7NU
Received
4 Sept 2026
Validated
8 Sept 2026
Ward
Tilbury Riverside
Case officer
Show
Target decision
3 Nov 2026
Applicant
Show

Public comments

No public comments yet.

Last counted 9 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
3 Nov 2026
Env. assessment
No
Thurrock
Planning Authority Score
6/10
Average
#104 of 296 councils
Relevant to this application:
Householder decisions

Thurrock is one of the fastest councils in England for householder decisions, ranking #25 out of 296. Thurrock is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Thurrock decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #252 of 296
82%
Householder approved
Below avg (90%) #271 of 296
84%
Decided in 8 weeks
Above avg (63%) #25 of 296
31%
Extended time limit
Below avg (41%) #62 of 296
65%
Minor dwellings approved
74 decided (1-9 homes)
43%
Major dwellings approved
7 decided (10+ homes)
86%
Change of use approved
43 decided
671
Total decisions
124 refused in the year to March 2026