40-42 Beverley Road And 11A College Street Hull HU3 1YE Data via plota.co.uk

26/00750/FULL - Full Planning Permission Pending Consideration

Proposal

Change of use from hotel (use class C1) to form 30 bedroom house in multiple occupation (HMO) with detached self-contained building to rear containing a further 2 bedrooms (sui generis use) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Jul 2026
✓
Validated
24 Aug 2026
Decision
Target date was 19 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 29 Oct 2026 and 12 Dec 2026, from Hull's recent changes of use.

The consultation period closed on 30 Sept 2026.

Documents 30

All documents on the council site ↗

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Beverley Road conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Heritage at risk: Beverley Road, Hull
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
National infrastructure project 699 m away: A63 Castle Street Improvement-Hull
The site is 699 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
6 listed buildings within 150 m; Inside the Kingston upon Hull built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hull
Application type
Full Planning Permission
Postcode
HU3 1YE
Received
30 Jul 2026
Validated
24 Aug 2026
Ward
Central
Case officer
Show
Agent
Maria Ferguson Planning Limited

Decision outlook

Day 65 of the 56-day target. Hull usually decides changes of use by day 106.

Day 6541 days to the predicted decision (day 106)
29%decided within 8 weeks
98%approved
7%go to committee

Plota live figures for changes of use decided by Hull in the last twelve months, from validation. Hull decision record →

Public comments

1comment received
1 neutral

4 neighbours consulted · Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15119855
Planning Portal ref
PP-15119855
Comments by
30 Sept 2026
Env. assessment
No
Hull
Planning Authority Score
2.6/10
Poor
#248 of 296 councils
Relevant to this application:
Change of use

Hull is slower than most councils at deciding householder applications, ranking #231 out of 296. The council extends the time limit on 62% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #85 of 296
92%
Householder approved
Above avg (90%) #156 of 296
51%
Decided in 8 weeks
Below avg (63%) #231 of 296
62%
Extended time limit
Above avg (41%) #273 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
88%
Change of use approved
33 decided
436
Total decisions
36 refused in the year to March 2026