Centre Of Pond 183M From Wit's End, Bishops Stortford Road 109M From Unnamed Road Bishops Stortford Road… Data via plota.co.uk

26/01194/FUL Pending Consideration

Proposal

The construction of two temporary bellmouths accesses, including TB-B102 located on a private access road off A1060 Roxwell Road and temporary bellmouth TB-B104 located on Vicarage Road. Existing bellmouth access TB-B103 located on Roxwell Road A1060 will be retained with only temporary minor changes to road markings and signage. The works include; temporary fencing (with gate), temporary highway signage, utility works, associated vegetation clearance, and a proposed scheme for landscape re-instatement following removal of the temporary works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Sept 2026
Decision
Expected by 6 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision soon after comments close on 11 Nov 2026, from Chelmsford's recent utility and infrastructure works.

Comments are open until 11 Nov 2026

Comment on this application ↗

Site constraints 5

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 1
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 926 m away: Norwich to Tilbury
The site is about 926 m from the project boundary. Electricity line, examination closed, recommendation due.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
5 listed buildings within 150 m of the postcode pin; Conservation area about 54 m away: Roxwell Conservation Area.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Chelmsford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Chelmsford
Received
11 Sept 2026
Validated
11 Sept 2026
Target decision
6 Nov 2026

Decision outlook

Day 47 of the 56-day target. Chelmsford usually decides utility and infrastructure works by day 56.

Day 4715 days to the predicted decision (day 62)
57%decided within 8 weeks
79%approved
30decided in the last year

Plota live figures for utility and infrastructure works decided by Chelmsford in the last twelve months, from validation. Chelmsford decision record →

Public comments

No public comments yet.

Last counted 26 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15136943
Planning Portal ref
PP-15136943
Comments by
11 Nov 2026
Chelmsford
Planning Authority Score
7.4/10
Good
#45 of 296 councils
Relevant to this application:
Householder decisions

Chelmsford is one of the fastest councils in England for householder decisions, ranking #23 out of 296. Only 21% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Chelmsford decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #167 of 296
90%
Householder approved
Above avg (90%) #188 of 296
84%
Decided in 8 weeks
Above avg (63%) #23 of 296
21%
Extended time limit
Below avg (41%) #19 of 296
76%
Minor dwellings approved
164 decided (1-9 homes)
88%
Major dwellings approved
8 decided (10+ homes)
79%
Change of use approved
52 decided
1,304
Total decisions
168 refused in the year to March 2026