Conroy Group, Main Road, Butterwick, Boston, PE22 0JH Data via plota.co.uk

B/26/0193 - Full Planning Permission Approved

Proposal

Extension to existing workshop Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Apr 2026
✓
Consultation
12 May 2026
✓
Approved
17 Aug 2026

Approved on 17 Aug 2026 · Delegated Decision · Last checked 24 Sept 2026

Documents 21

All documents on the council site ↗

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 1. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 820 m away: Outer Dowsing Offshore Wind (Generating Station)
The site is 820 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
1 listed building within 150 m.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area124 m² (1,335 sq ft)
Energy ratingA (asset rating 15)
UseStorage or Distribution
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in March 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Boston - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Boston
Application type
Full Planning Permission
Postcode
PE22 0JH
Received
23 Apr 2026
Validated
23 Apr 2026
Ward
Coastal Ward
Parish
Butterwick
Case officer
Show
Target decision
18 Jun 2026
Decision
Approved
Decision date
17 Aug 2026
Decision level
Delegated Decision
Applicant
Show
Agent
BPM-Architecture Ltd
Leaseholder
Show

How this decision compares

Decided in 116 days from validation, 61 days slower than Boston's median of 55 for extensions. Approved, as 95% of extensions here are.

67%decided within 8 weeks
95%approved
89decided in the last year

Plota live figures for extensions decided by Boston in the last twelve months, from validation. Boston decision record →

Public comments

No public comments yet.

44 neighbours consulted · Last counted 24 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14882712
Neighbours
24 Jul 2026
Consultation
12 May 2026
Comments by
2 Jun 2026
Statutory expiry
18 Jun 2026
Env. assessment
No

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.