25/09400/FULL - Full Planning Permission Application Pending

Proposal

External and internal alterations, including the partial removal of non-heritage additions and the remodelling of the 1980s rear extension, provision of terraces and roof garden and associated works. (Linked to 25/09401/LBC) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Dec 2025
✓
Validated
13 Aug 2026
Decision
Target date was 23 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 29 Oct 2026; it is now day 77.

The consultation period closed on 1 Apr 2026.

Documents 136

Statements & assessments 23

PDF ARUP RESPONSE TO TRANSPORT AND WASTE OFFICER COMMENTS_REV A Background Papers · 1 Jul 2026 View ↗ PDF APPENDIX 4 - ARUP SUSTAINABILITY NOTE Sustainability appraisal · 16 Jun 2026 View ↗ PDF LOCAL FLOOD AUTHORITY RESPONSE Consultee Comment · 27 Mar 2026 View ↗ PDF DESIGN & ACCESS STATEMENT (PART 1) Design and Access Statement · 20 Jan 2026 View ↗ PDF DESIGN & ACCESS STATEMENT (PART 2) Design and Access Statement · 20 Jan 2026 View ↗ PDF DESIGN & ACCESS STATEMENT (PART 3) Design and Access Statement · 20 Jan 2026 View ↗ PDF ENERGY STATEMENT Energy Assessment · 20 Jan 2026 View ↗
PDF Commenter’s name hidden Show Statement of Community Involvement · 20 Jan 2026 View ↗
PDF SUSTAINABLE DESIGN STATEMENT Sustainability appraisal · 20 Jan 2026 View ↗ PDF WHOLE LIFE-CYCLE CARBON ASSESSMENT Sustainability appraisal · 20 Jan 2026 View ↗ PDF HERITAGE IMPACT STATEMENT Heritage Statement · 20 Jan 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT Background Papers · 22 Dec 2025 View ↗ PDF DAYLIGHT AND SUNLIGHT IMPACT ASSESSMENT Daylight and Sunlight assessment · 22 Dec 2025 View ↗ PDF CRIME PREVENTION STATEMENT Crime Prevention Statement · 22 Dec 2025 View ↗ PDF FIRE STATEMENT Background Papers · 22 Dec 2025 View ↗ PDF FLOOD RISK ASSESSMENT AND SUSTAINABLE DRAINAGE STRATEGY Flood risk assessment · 22 Dec 2025 View ↗ PDF FLOOD RISK ASSESSMENT AND SUSTAINABLE DRAINAGE STRATEGY Flood risk assessment · 22 Dec 2025 View ↗ PDF FLOOD RISK ASSESSMENT AND SUSTAINABLE DRAINAGE STRATEGY Flood risk assessment · 22 Dec 2025 View ↗ PDF NOISE IMPACT ASSESSMENT (ACOUSTIC REPORT) Noise impact assessment · 22 Dec 2025 View ↗ PDF OBTRUSIVE LIGHTING ASSESSMENT Background Papers · 22 Dec 2025 View ↗ PDF PLANNING STATEMENT Planning Statement · 22 Dec 2025 View ↗ PDF PEA BREEAM LAND USE AND ECOLOGY AND UGF ASSESSMENT Background Papers · 22 Dec 2025 View ↗ PDF TOWNSCAPE VISUAL AND BUILT HERITAGE IMPACT ASSESSMENTCLUDING CONTAMINATION PHASE Heritage Statement · 22 Dec 2025 View ↗

Plans & drawings 66

PDF GROUND FLOOR - REAR ARRIVAL DETAILED PLAN Background Papers · 1 Jul 2026 View ↗ PDF APPENDIX 2 - CMP ADDENDUM NOTE Construction Management Plan · 16 Jun 2026 View ↗ PDF DEMOLITION FLOOR PLANS PACK (REV P04) Drawing · 20 Jan 2026 View ↗ PDF EXISTING FLOOR PLANS PACK (REV P04) Drawing · 20 Jan 2026 View ↗ PDF CONSTRUCTION MANAGEMENT PLAN Background Papers · 22 Dec 2025 View ↗ PDF PARKING DESIGN AND MANAGEMENT PLAN Background Papers · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PLANS PROPOSED GROUND LEVEL Drawing · 22 Dec 2025 View ↗ PDF GENERAL ARRANGEMENT PLANS PROPOSED LEVEL 01 Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PLANS PROPOSED LEVEL 02 Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PLANS PROPOSED LEVEL 03 Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PLANS PROPOSED LEVEL 04 Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PLANS PROPOSED LEVEL 05 Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PLANS PROPOSED LEVEL 06 Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PLANS PROPOSED BASEMENT LEVEL 1 Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PLANS PROPOSED BASEMENT MEZZANINE Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PLANS PROPOSED ROOF TERRACE LEVEL Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PLANS PROPOSED ROOF LEVEL Drawing · 22 Dec 2025 View ↗ PDF SITE PLAN EXISTING Drawing · 22 Dec 2025 View ↗ PDF LONG TERM SITE PLAN PROPOSED Drawing · 22 Dec 2025 View ↗ PDF LONG TERM SITE LOCATION PLAN EXISTING Drawing · 22 Dec 2025 View ↗ PDF LONG TERM SITE LOCATION PLAN PROPOSED Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT EXISTING SECTION NO.12 & REAR BUILDING Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT EXISTING SECTION NO.11 & REAR BUILDING Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT EXISTING SECTION REAR BUILDING 01 Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT EXISTING SECTION REAR BUILDING 02 Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT SECTION - DEMOLITION NO.12 & REAR BUILDING Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT SECTION - DEMOLITION NO.11 & REAR BUILDING Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT SECTION - DEMOLITION REAR BUILDING 01 Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT SECTION - DEMOLITION REAR BUILDING 02 Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PROPOSED SECTION NO.12 & REAR BUILDING Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PROPOSED SECTION NO.11 & REAR BUILDING Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PROPOSED SECTION REAR BUILDING 01 Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PROPOSED SECTION REAR BUILDING 02 Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT EXISTING ELEVATION ATRIUM Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT EXISTING ELEVATION EAST ELEVATION Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT EXISTING ELEVATION ORMOND YARD Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT EXISTING ELEVATION NORTH ELEVATION Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT EXISTING ELEVATION WEST ELEVATION Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT EXISTING ELEVATION SOUTH ELEVATION Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT EXISTING ELEVATION ST' JAMES SQUARE Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT ELEVATION - DEMOLITION ATRIUM ELEVATION Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT ELEVATION - DEMOLITION EAST ELEVATION Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT ELEVATION - DEMOLITION ORMOND YARD Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT ELEVATION - DEMOLITION NORTH ELEVATION Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT ELEVATION - DEMOLITION WEST ELEVATION Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT ELEVATION - DEMOLITION SOUTH ELEVATION Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT ELEVATION - DEMOLITION ST' JAMES SQUARE Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PROPOSED ELEVATION GARDEN & ATRIUM Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PROPOSED ELEVATION EAST ELEVATION Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PROPOSED ELEVATION ORMOND YARD Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PROPOSED ELEVATION NORTH ELEVATION Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PROPOSED ELEVATION NORTH ELEVATION Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PROPOSED ELEVATION WEST ELEVATION Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PROPOSED ELEVATION SOUTH ELEVATION Drawing · 22 Dec 2025 View ↗ PDF LONG TERM GENERAL ARRANGEMENT PROPOSED ELEVATION ST' JAMES SQUARE Drawing · 22 Dec 2025 View ↗ PDF LONG TERM ADDITIONS & ALTERATIONS NUMBER 11 & 12 ROOF Drawing · 22 Dec 2025 View ↗ PDF LONG TERM ADDITIONS & ALTERATIONS NUMBER 11 & 12 FRONT FACADE Drawing · 22 Dec 2025 View ↗ PDF LONG TERM ADDITIONS & ALTERATIONS NUMBER 11 & 12 BASEMENT Drawing · 22 Dec 2025 View ↗ PDF LONG TERM ADDITIONS & ALTERATIONS NUMBER 12 MAIN ENTRANCE Drawing · 22 Dec 2025 View ↗ PDF LONG TERM ADDITIONS & ALTERATIONS NUMBER 12 LOBBY Drawing · 22 Dec 2025 View ↗ PDF LONG TERM ADDITIONS & ALTERATIONS NUMBER 12 LOBBY Drawing · 22 Dec 2025 View ↗ PDF LONG TERM ADDITIONS & ALTERATIONS NUMBER 12 ANTEROOM Drawing · 22 Dec 2025 View ↗ PDF LONG TERM ADDITIONS & ALTERATIONS NUMBER 12 ANTEROOM Drawing · 22 Dec 2025 View ↗ PDF LONG TERM ADDITIONS & ALTERATIONS NUMBER 12 LEVEL 03 OFFICE Drawing · 22 Dec 2025 View ↗ PDF LONG TERM ADDITIONS & ALTERATIONS NUMBER 12 WALL RECLADDING Drawing · 22 Dec 2025 View ↗ PDF TECHNICAL AND PROJECT INFORMATION DRAWING LIST Background Papers · 22 Dec 2025 View ↗

Other documents 24

PDF DRAFT S106 AGREEMENT Legal Agreement · 3 Aug 2026 View ↗ PDF OVERLOOKING & SCREENING STUDY Background Papers · 9 Jul 2026 View ↗ PDF OVERLOOKING & SCREENING STUDY Background Papers · 9 Jul 2026 View ↗ PDF APPENDIX 3 - OVERLOOKING & SCREENING STUDY Superseded document · 16 Jun 2026 View ↗ PDF APPENDIX 5 - LIGHT SPILL Background Papers · 16 Jun 2026 View ↗ PDF ECNSLT-INTERNAL CONSULTS Background Papers · 17 Mar 2026 View ↗ PDF ECNSLT-INTERNAL CONSULTS Background Papers · 17 Mar 2026 View ↗ PDF CNSLT-WARD COUNCILLORS Background Papers · 17 Mar 2026 View ↗ PDF CNSLT-WARD COUNCILLORS Background Papers · 17 Mar 2026 View ↗ PDF CNSLT-LA SOCIETY Background Papers · 17 Mar 2026 View ↗ PDF COVER LETTER 20.01.2026 Background Papers · 3 Mar 2026 View ↗ PDF ACK-GENERAL LETTER (G/P/C) Background Papers · 2 Mar 2026 View ↗ PDF ECNSLT-INTERNAL CONSULTS Background Papers · 2 Mar 2026 View ↗ PDF ECNSLT-INTERNAL CONSULTS Background Papers · 2 Mar 2026 View ↗ PDF ECNSLT-INTERNAL CONSULTS Background Papers · 2 Mar 2026 View ↗ PDF CNSLT-LA SOCIETY Background Papers · 2 Mar 2026 View ↗ PDF CNSLT-LA SOCIETY Background Papers · 2 Mar 2026 View ↗ PDF SITE NOTICE 21 OR 28 DAYS IF T&C APPL. Background Papers · 2 Mar 2026 View ↗ PDF RECEIPT OF APPLICATION Other · 14 Feb 2026 View ↗ PDF APPENDIX PART 1 Background Papers · 22 Dec 2025 View ↗ PDF APPENDIX PART 2 Background Papers · 22 Dec 2025 View ↗ PDF ATTACHMENT SUMMARY Background Papers · 22 Dec 2025 View ↗ PDF COVER LETTER 19.12.2025 Background Papers · 22 Dec 2025 View ↗ PDF OPERATIONAL MANAGEMENT PLANIC REPORT) Background Papers · 22 Dec 2025 View ↗

All documents on the council site ↗

Associated applications 2

Site constraints 13

Grade II listed: 12, St James's Square Sw1
List entry 1235770 · The pin is inside its outline · 38 more listed buildings within 150 m (5 Grade I, 10 Grade II*, 23 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 38 with distances
Historic England ↗
St James's conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
2 Article 4 directions
Article 4 Basement Development Permitted Rights Removed · Article 4 Direction Class E To C3 In Central Activities Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: City of Westminster APA 2.5
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: West End
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
National infrastructure project 429 m away: Thames Tideway Tunnel
The site is 429 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 238 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Registered park or garden 29 m away: St James's Square
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
Inside the City of Westminster built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Priority habitat 30 m away: Deciduous woodland; Tree preservation order 29 m away: W22_A1.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission Application
Postcode
SW1Y 4LB
Received
22 Dec 2025
Validated
13 Aug 2026
Ward
St James's
Case officer
Show
Target decision
23 Oct 2026
Applicant
Show
Agent
Bidwells

Decision outlook

Day 77, past the statutory target. 84% of extensions in Westminster are decided within thirteen weeks, which runs to 12 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 28 Oct 2026.

Day 7721 days past the 56-day target
56%decided within 8 weeks
88%approved
1,688decided in the last year

Plota live figures for extensions decided by Westminster in the last twelve months, from validation. Westminster decision record →

Public comments

13comments received
10 objecting1 neutral2 supporting

77% object · above the UK average of 74%

133 neighbours consulted · Last counted 28 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14504551
Planning Portal ref
PP-14504551
Comments by
1 Apr 2026
Site or press notice
11 Mar 2026
Committee
18 Aug 2026
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026