Land at Forgeside, Sennybridge, Brecon, Powys, LD3 8RB Data via plota.co.uk

P/26/0922/FUL - Full planning permission Valid

Proposal

Creation of a new, separate vehicular access track to Forgeside Farriers and associated works which include tree removal and hedge translocation Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
28 Aug 2026
Decision
Expected by 23 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 19 Sept 2026 and 4 Oct 2026, from Powys's recent agricultural works.

Site constraints 2

Nutrient neutrality catchment: River Usk
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Predicted from the national soil map. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Powys - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Powys
Application type
Full planning permission
Postcode
LD3 8RB
Received
28 Aug 2026
Validated
28 Aug 2026
Ward
Maescar/Llywel
Parish
Llywel
Case officer
Show
Target decision
23 Oct 2026
Decision level
Delegated Decision
Applicant
Show
Agent
William Tambling

Decision outlook

Day 17 of the 56-day target. Powys usually decides agricultural works by day 28.

Day 1739 days to the 56-day target
68%decided within 8 weeks
96%approved
127decided in the last year

Plota live figures for agricultural works decided by Powys in the last twelve months, from validation. Powys decision record →

Public comments

No public comments yet.

Last counted 11 Sept 2026

Read the comments on the council site ↗