Forest Bridge School Braywick Park Braywick Road Maidenhead SL6 1BN Data via plota.co.uk

26/01471/CONDIT - Discharge of Condition Decided

Proposal

Details required by Condition 2 (Materials), 3 (BNG - partial), 4 (Biodiversity enhancements), 6 (Drainage), 8 (Drainage system for infiltration) and 9 (Piling) of planning permission for the Erection of a detached educational building with 2no. air source heat pumps, new fence, gates and associated landscaping. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Jun 2026
✓
Partial Refusal/Partial Approval
7 Aug 2026

Partial Refusal/Partial Approval on 7 Aug 2026 · Delegated · Last checked 8 Aug 2026

Documents 18

All documents on the council site ↗

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 2, 3, 4, 6, 8, 9 decided (outcome not recorded)

    • ConditionsDetails required by Condition 2 (Materials), 3 (BNG - partial), 4 (Biodiversity enhancements)…This application26/01471/CONDIT

Site constraints 7

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Local nature reserve 199 m away: Braywick Park
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 871 m away: M4 Junctions 3 to 12 Smart Motorway
The site is 871 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; SSSI 382 m away: Bray Meadows SSSI; Inside the Maidenhead built-up area.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £250,000 in January 2021. Other property, leasehold.

5 January 2021£250,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area2,754 m² (29,644 sq ft)
Energy ratingA (asset rating 20)
UseD1 Non-residential Institutions - Education
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in February 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Windsor and Maidenhead - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge of Condition
Postcode
SL6 1BN
Received
15 Jun 2026
Validated
15 Jun 2026
Ward
Oldfield
Parish
Maidenhead Unparished
Case officer
Show
Target decision
9 Aug 2026
Decision
Partial Refusal/Partial Approval
Decision date
7 Aug 2026
Decision level
Delegated
Applicant
Show
Leaseholder
Show

Consultation & key dates

Alt. reference
PP-15008574
Planning Portal ref
PP-15008574
Statutory expiry
9 Aug 2026
Env. assessment
No
Windsor and Maidenhead
Planning Authority Score
5.3/10
Average
#135 of 296 councils
Relevant to this application:
Householder decisions

Windsor and Maidenhead is faster than most councils at deciding householder applications, ranking #82 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Windsor and Maidenhead is also one of the strictest councils - it refuses more householder applications than almost any other, with only 74% approved vs 90% nationally.

One of the strictest councils
only 74% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Windsor and Maidenhead decision statistics
Based on MHCLG data, the year to March 2026
72%
Overall approval rate
Below avg (87%) #293 of 296
74%
Householder approved
Below avg (90%) #294 of 296
75%
Decided in 8 weeks
Above avg (63%) #82 of 296
28%
Extended time limit
Below avg (41%) #47 of 296
44%
Minor dwellings approved
156 decided (1-9 homes)
96%
Major dwellings approved
27 decided (10+ homes)
64%
Change of use approved
25 decided
1,530
Total decisions
434 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.