Hammersmith Hospital Du Cane Road, London, W12 0HS Data via plota.co.uk

P/2026/02657/FUL - Full Planning Application REGISTERED: Valid

Proposal

Erection of a single storey modular building to be used as a Clinical Trials Unit (CTU), within the existing car parking area. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Oct 2026
✓
Validated
21 Oct 2026
Decision
Expected by 16 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 25 Dec 2026 and 15 Jan 2027, from Hammersmith and Fulham's recent full applications.

Comments are open until 25 Nov 2026

Comment on this application ↗

Documents 20

All documents on the council site ↗

Site constraints 6

Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Local nature reserve 255 m away: Wormwood Scrubs
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
National infrastructure project 1618 m away: Thames Tideway Tunnel; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Designated open space 32 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 28 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
W12 0HS
Received
20 Oct 2026
Validated
21 Oct 2026
Ward
College Park And Old Oak
Case officer
Show
Applicant
Show

Decision outlook

Day 8 of the 56-day target. Hammersmith and Fulham usually decides full applications by day 76.

Day 868 days to the predicted decision (day 76)
29%decided within 8 weeks
98%approved
759decided in the last year

Plota live figures for full applications decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
28 Oct 2026
Comments by
25 Nov 2026
Site or press notice
4 Nov 2026
Statutory expiry
16 Dec 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026