62/11/25/011LB - Listed Building Consent Approved

Proposal

Listed building consent for the proposed dismantling and rebuild of the Southern pier. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Aug 2025
✓
Validated
26 Aug 2025
✓
Approved
21 Oct 2025

Approved on 21 Oct 2025 · Delegated · Last checked 14 Oct 2026

Site constraints 10

2 listed buildings within 150 m of the postcode pin
Nearest: The Lodge, Grade II, about 3 m from the postcode pin · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Exmoor National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Public footpath about 5 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Heritage coast: Exmoor
A defined stretch of undeveloped coastline.
Development inconsistent with keeping the coast undeveloped is resisted.
Habitat network: Maritime cliff and slope
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 4; Special area of conservation about 450 m away: Exmoor Heaths; SSSI about 442 m away: Glenthorne SSSI; Priority habitat about 8 m away: Maritime cliff and slope; Open access land about 4 m away: Access Land - Combined Open Country, Registered Common Land and Section 16 Dedicated Land. MoD Byelaw, Section 28 Exclusions, Racecourses and Aerodromes and ECP Margin have been removed..
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Exmoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Exmoor
Application type
Listed Building Consent
Received
12 Aug 2025
Validated
26 Aug 2025
Case officer
Show
Target decision
21 Oct 2025
Decision
Approved with Conditions
Decision date
21 Oct 2025
Decision level
Delegated
Applicant
Show
Agent
Exmoor Design

How this decision compares

Decided in 56 days from validation, about the council's usual 56 days. Approved, as 100% of listed building works here are.

61%decided within 8 weeks
100%approved
5%go to committee

Plota live figures for listed building works decided by Exmoor in the last twelve months, from validation. Exmoor decision record →

Public comments

No public comments yet.

Last counted 14 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
27 Aug 2025
Comments by
25 Sept 2025
Statutory expiry
21 Oct 2025
Exmoor
Planning Authority Score
4.4/10
Below average
#179 of 296 councils
Relevant to this application:
Other decisions

Exmoor is slower than most councils at deciding householder applications, ranking #248 out of 296. 52% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Exmoor decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #10 of 296
98%
Householder approved
Above avg (90%) #15 of 296
47%
Decided in 8 weeks
Below avg (63%) #248 of 296
52%
Extended time limit
Above avg (41%) #234 of 296
100%
Minor dwellings approved
4 decided (1-9 homes)
96%
Change of use approved
26 decided
174
Total decisions
7 refused in the year to March 2026