Suite 3 Ground Floor Exchange Building Adelaide Street Maritime Quarter Swansea SA1 1SH Data via plota.co.uk

2026/0870/LBC - Listed Building Consent Approved

Proposal

Two externally illuminated projecting signs, two internally illuminated window signs, two internally illuminated individual letter signs, two internally illuminated hanging signs, two externally illuminated menu signs, installation of spotlights and lantern (application for Listed Building Consent) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 May 2026
✓
Validated
1 Jun 2026
✓
Consultation
1 Jun 2026
✓
Approved
9 Oct 2026

Approved on 9 Oct 2026 · Delegated Decision · Last checked 10 Oct 2026

Site constraints 5

Grade II listed: Restaurant (Exchange Buildings)
List entry 11556 · 6 m away · 29 more listed buildings within 150 m (3 Grade II*, 26 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 29 with distances
Cadw ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Maritime Quarter conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
National infrastructure project 1059 m away: Tidal Lagoon Swansea Bay
The site is 1059 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Coalfield, development low risk area.
Not affected
No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Swansea - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Swansea
Application type
Listed Building Consent
Postcode
SA1 1SH
Received
22 May 2026
Validated
1 Jun 2026
Ward
Waterfront - Bay Area
Case officer
Show
Target decision
25 Aug 2026
Decision
Approve
Decision date
9 Oct 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Richard Pedlar Architects
Freehold owner
Show

How this decision compares

Decided in 130 days from validation, 68 days slower than Swansea's median of 62 for listed building works. Approved, as 97% of listed building works here are.

47%decided within 8 weeks
97%approved
11%go to committee

Plota live figures for listed building works decided by Swansea in the last twelve months, from validation. Swansea decision record →

Public comments

No public comments yet.

Last counted 10 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14955210
Planning Portal ref
PP-14955210
Consultation
1 Jun 2026
Comments by
6 Jul 2026
Site or press notice
15 Jun 2026
Statutory expiry
27 Jul 2026
Env. assessment
No

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.