Olympia Exhibition Centre Hammersmith Road London W14 8UX Data via plota.co.uk

P/2026/02131/VAPO - Vary or Discharge Planning Obligation REGISTERED: Under Assessment

Proposal

Deed of Variation to the Section 106 Agreement attached to planning permission dated 25 October 2019. Proposed variations include: Amendment of Schedule 4 (Section 278 works) and associated scope of works (Annex 1) and plans 2a, 2b, 2c and 2d, and Deletion of the requirement in Schedule 15 (TfL) for a financial contribution to be made towards the delivery of the A315 Cycle Route. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Jul 2026
✓
Validated
21 Aug 2026
Decision
Target date was 16 Oct 2026

Under consideration

No decision has been issued yet. A decision is expected by 16 Oct 2026.

The consultation period closed on 11 Sept 2026.

Associated applications 2

  • Part of

    Fullcouncil archive
    • Planning obligationDeed of Variation to the Section 106 Agreement. Proposed variations include: Amendment…This applicationP/2026/02131/VAPO

Site constraints 7

Grade II* listed: Grand Hall and Pillar Hall, Olympia Exhibition Centre
List entry 1096048 · 22 m away · 4 more listed buildings within 150 m (4 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 4 with distances
Historic England ↗
Olympia and Avonmore conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 738 m away: Thames Tideway Tunnel
The site is 738 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area11,968 m² (128,822 sq ft)
Energy ratingA (asset rating 19)
UseHotels
HeatingAir Conditioning

From the energy performance certificate lodged in July 2026, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Vary or Discharge Planning Obligation
Postcode
W14 8UX
Received
27 Jul 2026
Validated
21 Aug 2026
Ward
Avonmore
Case officer
Show
Applicant
Show
Agent
Justin Quiney / NEWMARK

Consultation & key dates

Consultation
21 Aug 2026
Comments by
11 Sept 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.