118 Elgin Crescent, London, W11 2JL Data via plota.co.uk

Consultation PP/26/05004
Date received
18 Sept 2026
Date validated
18 Sept 2026
Postcode
W11 2JL

Description

Installation of two air source condenser units on the roof within an acoustic enclosure. Data via plota.co.uk

Last checked

Decision outlook

Plota predicts a decision between 28 Nov 2026 and 9 Jan 2027, from Kensington and Chelsea's recent utility and infrastructure works.

Day 21 of the 56-day target. Kensington and Chelsea usually decides utility and infrastructure works by day 90.

Day 2169 days to the predicted decision (day 90)
29%decided within 8 weeks
95%approved
311decided in the last year

Plota live figures for utility and infrastructure works decided by Kensington and Chelsea in the last twelve months, from validation. Kensington and Chelsea decision record →

Site constraints 9

Ladbroke conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
3 Article 4 directions
Article 4 - No 41 · Article 4 - No 68 · Article 4 - No 100. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Tree preservation order
Consent is needed before work on protected trees.
Not every council has published its orders as open data, so no order shown is not proof there is none.
Air quality management area: Kensington and Chelsea AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Registered park or garden 19 m away: Ladbroke Estate
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Also on the record
Inside the Kensington and Chelsea built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square; Priority habitat 20 m away: Deciduous woodland; Designated open space 18 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £10,500,000 in September 2025. Terraced house, freehold.

28 September 2025£10,500,000
10 September 2004£3,350,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area361 m² (3,886 sq ft)
Energy ratingD (65 out of 100), could reach C
PropertyMid-terrace house, 9 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in August 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Kensington and Chelsea - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Kensington and Chelsea
Planning Authority Score
5.1/10
Average
#144 of 296 councils
Relevant to this application:
Householder decisions

Kensington and Chelsea ranks #174 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Kensington and Chelsea decision statistics
Based on MHCLG data, the nine months to December 2025
93%
Overall approval rate
Above avg (87%) #58 of 296
94%
Householder approved
Above avg (90%) #110 of 296
61%
Decided in 8 weeks
Below avg (63%) #174 of 296
40%
Extended time limit
Below avg (41%) #152 of 296
94%
Minor dwellings approved
455 decided (1-9 homes)
87%
Change of use approved
53 decided
1,839
Total decisions
135 refused in the nine months to December 2025

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.