Seal Sands Link Road Culvert Number 1 Seal Sands Link Road Billingham TS2 1TP Data via plota.co.uk

26/1145/OHL - Overhead Electricity Lines (6 wk deter) Awaiting decision

Proposal

Exemption notice for the installation of a platform to the 132Kv Tower for essential upgrade works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 May 2026
✓
Consultation
11 Jun 2026
Decision
Target date was 6 Jul 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 28 Oct 2026; it is now day 154.

The consultation period closed on 2 Jul 2026.

Site constraints 8

Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Special protection area about 143 m away: Teesmouth and Cleveland Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
National infrastructure project about 412 m away: The Net Zero Teesside Project
The site is about 412 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Lighthouse Green Fuels Project (application submitted, about 585 m); East Coast Hydrogen Teesside Pipeline (at pre-application, about 310 m); H2NorthEast (H2NE) (at pre-application, about 329 m); H2Teesside (withdrawn, about 412 m); Lighthouse Green Fuels Project (DISCONTINUED) (withdrawn, about 707 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Sssi
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature recovery project: Tees Estuary Recovering Nature (TERN); SSSI about 328 m away: Teesmouth and Cleveland Coast SSSI.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Stockton-on-Tees - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Overhead Electricity Lines (6 wk deter)
Postcode
TS2 1TP
Received
27 May 2026
Validated
27 May 2026
Ward
Billingham South
Parish
Billingham Town Council
Case officer
Show
Target decision
6 Jul 2026
Decision level
Delegated
Applicant
Show

Decision outlook

Day 154, past the statutory target. 92% of utility and infrastructure works in Stockton-on-Tees are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 25 Oct 2026.

Day 15498 days past the 56-day target
86%decided within 8 weeks
98%approved
81decided in the last year

Plota live figures for utility and infrastructure works decided by Stockton-on-Tees in the last twelve months, from validation. Stockton-on-Tees decision record →

Public comments

No public comments yet.

Last counted 25 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
11 Jun 2026
Comments by
2 Jul 2026
Statutory expiry
24 Jun 2026
Env. assessment
No
Stockton-on-Tees
Planning Authority Score
5.8/10
Average
#112 of 296 councils
Relevant to this application:
Householder decisions

Stockton-on-Tees ranks #180 out of 296 councils for householder decision speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Stockton-on-Tees decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #67 of 296
97%
Householder approved
Above avg (90%) #44 of 296
61%
Decided in 8 weeks
Below avg (63%) #180 of 296
40%
Extended time limit
Below avg (41%) #155 of 296
79%
Minor dwellings approved
19 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
86%
Change of use approved
44 decided
612
Total decisions
41 refused in the year to March 2026