Sidgwick Site, Faculty Of History West Road Cambridge Cambridgeshire CB3 9EF Data via plota.co.uk

26/00482/S73 - Section 73 - Remove/Vary Condition Approved

Proposal

S73 to vary condition 2 (approved drawings) of ref: (Alteration, refurbishment and extension to the Stirling Building, including 2no. pavilion blocks to the north and south and additional access arrangements. Associated changes to landscape and additional cycle parking including detached covered cycle store) to include: Removal of the podium ramp and replace with a platform lift. Changes to balustrades and precast pavers and copings along with fixed glass louvres. Remove skylights within the new build elements. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 6 Feb 2026
✓
Consultation
26 Feb 2026
✓
Approved
6 May 2026

Approved on 6 May 2026 · Delegated Decision · Last checked 25 Sept 2026

Documents 33

All documents on the council site ↗

Associated applications 8

Site constraints 8

Grade II* listed: History Faculty Building
List entry 1380217 · The pin is inside its outline · 8 more listed buildings within 150 m (1 Grade II*, 7 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 8 with distances
Historic England ↗
West Cambridge conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Air quality management area: Cambridge AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Local nature reserve 412 m away: Sheep's Green and Coe Fen; Registered park or garden 170 m away: King's College; Inside the Cambridge (Cambridge) built-up area; Priority habitat 40 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cambridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cambridge
Application type
Section 73 - Remove/Vary Condition
Postcode
CB3 9EF
Received
around 6 Feb 2026
Validated
6 Feb 2026
Ward
Newnham
Case officer
Show
Target decision
7 May 2026
Decision
Granted Permission
Decision date
6 May 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Head of Estates

Public comments

No public comments yet.

32 neighbours consulted · Last counted 25 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Site or press notice
26 Feb 2026
Statutory expiry
3 Apr 2026
Env. assessment
No
Cambridge
Planning Authority Score
8.3/10
Excellent
#18 of 296 councils
Relevant to this application:
Householder decisions

Cambridge is one of the fastest councils in England for householder decisions, ranking #21 out of 296. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cambridge decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #108 of 296
94%
Householder approved
Above avg (90%) #100 of 296
86%
Decided in 8 weeks
Above avg (63%) #21 of 296
26%
Extended time limit
Below avg (41%) #34 of 296
74%
Minor dwellings approved
86 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
80%
Change of use approved
41 decided
1,014
Total decisions
100 refused in the year to March 2026