Mellishaw North Development Site Mellishaw Lane Heaton With Oxcliffe Lancashire Data via plota.co.uk

Proposal

Erection of five buildings comprising employment units, gym and fitness centre, drive-through coffee shop, car workshop and MOT bay, EV charging facilities and substation, together with internal roads, service areas, car parking, landscaping and associated site works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Sept 2026
✓
Validated
12 Oct 2026
✓
Consultation
13 Oct 2026
Decision
Expected by 11 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 30 Nov 2026 and 11 Dec 2026, from Lancaster's recent utility and infrastructure works.

Comments are open until 19 Nov 2026

Comment on this application ↗

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 778 m away: Heysham to M6 Link Road
The site is 778 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Nature improvement area: Morecambe Bay Limestones and Wetlands; Inside the Morecambe built-up area; Priority habitat 26 m away: Coastal and floodplain grazing marsh.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 13 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Lancaster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Lancaster
Application type
Full Application
Postcode
LA3 3FB
Received
28 Sept 2026
Validated
12 Oct 2026
Ward
Westgate Ward
Parish
Heaton With Oxcliffe
Case officer
Show
Target decision
11 Jan 2027
Applicant
Show
Agent
Lonsdale Studio Architects Ltd

Decision outlook

Day 16 of the 56-day target. Lancaster usually decides utility and infrastructure works by day 56.

Day 1640 days to the 56-day target
58%decided within 8 weeks
88%approved
17%go to committee

Plota live figures for utility and infrastructure works decided by Lancaster in the last twelve months, from validation. Lancaster decision record →

Public comments

No public comments yet.

18 neighbours consulted · Last counted 20 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15231470
Planning Portal ref
PP-15231470
Neighbours
13 Oct 2026
Consultation
13 Oct 2026
Comments by
19 Nov 2026
Site or press notice
22 Oct 2026
Statutory expiry
11 Jan 2027
Env. assessment
No
Lancaster
Planning Authority Score
5/10
Average
#147 of 296 councils
Relevant to this application:
Householder decisions

Lancaster is faster than most councils at deciding householder applications, ranking #84 out of 296. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Lancaster decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #237 of 296
87%
Householder approved
Below avg (90%) #231 of 296
74%
Decided in 8 weeks
Above avg (63%) #84 of 296
38%
Extended time limit
Below avg (41%) #130 of 296
71%
Minor dwellings approved
45 decided (1-9 homes)
63%
Major dwellings approved
16 decided (10+ homes)
63%
Change of use approved
48 decided
717
Total decisions
122 refused in the year to March 2026