Memorial Hall, Church Street, Tempsford, Sandy, SG19 2AW Data via plota.co.uk

CB/25/03843/FULL - Full Application Approved

Proposal

Erection of a side extension with roof lights and additional parking Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Dec 2025
✓
Validated
2 Jan 2026
✓
Approved
2 Jun 2026

Approved on 2 Jun 2026 · Last checked 18 Oct 2026

Site constraints 6

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 56 m away: A428 Black Cat to Caxton Gibbet Road Improvement scheme
The site is about 56 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: East West Rail - Bedford to Cambridge and Western improvements (at pre-application, about 1130 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
1 listed building within 150 m of the postcode pin; Conservation area about 73 m away: Tempsford (Church End) Conservation Area; Flood defence about 50 m from the postcode pin (natural high ground, designed for a 1 in 4 year flood).
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Central Bedfordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
SG19 2AW
Received
3 Dec 2025
Validated
2 Jan 2026
Parish
Tempsford
Case officer
Show
Target decision
27 Feb 2026
Decision
Full Application - Granted Conditions or Reasons: View Conditions or Reasons Informative Notes: 1 )GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF). 2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. 3 )You are advised to note the comments of the SuDs team regarding condition 8 as set out below. Surface water drainage must follow the SuDS National Standards; National standards for sustainable drainage systems (SuDS) - GOV.UK We will require a full set of calculations for each phase and in total, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). Any exceedance should be shown with pathways, depths and velocity. We will require full drainage drawings showing all connections, control features, storage, inverts etc. and how it communicates with the development wide scheme. We will require BRE365 infiltration test results There should be a minimum 1m between the base of a soakage unit and the seasonal water table. Any watercourses (this includes culverted) within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. The connection of private surface water drainage systems to a highway system is not permitted. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. The Council is not required to adopt any SuDS feature, this subject to agreements. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.You are advised to note the comments of the SuDs team regarding condition 8 as set out below. Surface water drainage must follow the SuDS National Standards; National standards for sustainable drainage systems (SuDS) - GOV.UK We will require a full set of calculations for each phase and in total, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). Any exceedance should be shown with pathways, depths and velocity. We will require full drainage drawings showing all connections, control features, storage, inverts etc. and how it communicates with the development wide scheme. We will require BRE365 infiltration test results There should be a minimum 1m between the base of a soakage unit and the seasonal water table. Any watercourses (this includes culverted) within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. The connection of private surface water drainage systems to a highway system is not permitted. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. The Council is not required to adopt any SuDS feature, this subject to agreements. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate. 4 ) NOTES TO APPLICANT The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system. The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301 or e-mail: streetworks@centralbedfordshire.gov.uk The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's : Parking standards for new developments Supplementary Planning Document (SPD) | Central Bedfordshire Council NOTES TO APPLICANT The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system. The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301 or e-mail: streetworks@centralbedfordshire.gov.uk The applicant is advised that parking for contractor's vehicles and the storage of materials and deliveries associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's : Parking standards for new developments Supplementary Planning Document (SPD) | Central Bedfordshire Council 5 )The applicants attention is drawn to their responsibility under The Equality Act 2010 and with particular regard to access arrangements for the disabled. The Equality Act 2010 requires that service providers must think ahead and make reasonable adjustments to address barriers that impede disabled people. These requirements are as follows: Where a provision, criterion or practice puts disabled people at a substantial disadvantage to take reasonable steps to avoid that disadvantage; Where a physical feature puts disabled people at a substantial disadvantage to avoid that disadvantage or adopt a reasonable alternative method of providing the service or exercising the function; Where not providing an auxiliary aid puts disabled people at a substantial disadvantage to provide that auxiliary aid. In doing this, it is a good idea to consider the range of disabilities that your actual or potential service users might have. You should not wait until a disabled person experiences difficulties using a service, as this may make it too late to make the necessary adjustment. For further information on disability access contact: The Centre for Accessible Environments (www.cae.org.uk) AdviceCentral@drcbeds.org.ukThe applicants attention is drawn to their responsibility under The Equality Act 2010 and with particular regard to access arrangements for the disabled. The Equality Act 2010 requires that service providers must think ahead and make reasonable adjustments to address barriers that impede disabled people. These requirements are as follows: Where a provision, criterion or practice puts disabled people at a substantial disadvantage to take reasonable steps to avoid that disadvantage; Where a physical feature puts disabled people at a substantial disadvantage to avoid that disadvantage or adopt a reasonable alternative method of providing the service or exercising the function; Where not providing an auxiliary aid puts disabled people at a substantial disadvantage to provide that auxiliary aid. In doing this, it is a good idea to consider the range of disabilities that your actual or potential service users might have. You should not wait until a disabled person experiences difficulties using a service, as this may make it too late to make the necessary adjustment. For further information on disability access contact: The Centre for Accessible Environments (www.cae.org.uk) AdviceCentral@drcbeds.org.uk 6 )The applicant is advised to avoid the bird nesting season (March to August). If this cannot be avoided, then the site should be checked for nesting birds by a suitably qualified ecologist prior to any site clearance (including vegetation clearance) taking place. If an occupied nest is found onsite, then an exclusion zone around the nest would be required and maintained until the nest is no longer in use.The applicant is advised to avoid the bird nesting season (March to August). If this cannot be avoided, then the site should be checked for nesting birds by a suitably qualified ecologist prior to any site clearance (including vegetation clearance) taking place. If an occupied nest is found onsite, then an exclusion zone around the nest would be required and maintained until the nest is no longer in use. 7 )Any conditions in bold must be discharged before the development commences. Failure to comply with this requirement could invalidate this permission and/or result in enforcement action.Any conditions in bold must be discharged before the development commences. Failure to comply with this requirement could invalidate this permission and/or result in enforcement action.
Decision date
2 Jun 2026

How this decision compares

Decided in 151 days from validation, 97 days slower than Central Bedfordshire's median of 54 for extensions. Approved, as 90% of extensions here are.

77%decided within 8 weeks
90%approved
100%go to committee

Plota live figures for extensions decided by Central Bedfordshire in the last twelve months, from validation. Central Bedfordshire decision record →

Public comments

43comments received
1 objecting42 supporting

98% support · above the UK average of 16%

Last counted 18 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
2 Jan 2026
Comments by
7 May 2026
Site or press notice
21 Jan 2026
Central Bedfordshire
Planning Authority Score
6.3/10
Average
#88 of 296 councils
Relevant to this application:
Householder decisions

Central Bedfordshire is faster than most councils at deciding householder applications, ranking #62 out of 296. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Central Bedfordshire decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #218 of 296
91%
Householder approved
Above avg (90%) #169 of 296
76%
Decided in 8 weeks
Above avg (63%) #62 of 296
35%
Extended time limit
Below avg (41%) #99 of 296
61%
Minor dwellings approved
153 decided (1-9 homes)
86%
Major dwellings approved
29 decided (10+ homes)
73%
Change of use approved
45 decided
1,444
Total decisions
226 refused in the year to March 2026