Hazel Lane Quarry Hazel Lane Hampole Doncaster Data via plota.co.uk

19/00136/SUB01 - Discharge of Conditions Request Awaiting decision

Proposal

Discharge of Condition 4 (Noise), Condition 5 (Dust), Condition 6 (Vibration Monitoring), Condition 7 (Landscaping), Condition 35 (Environmental Audit), Condition 36 (Annual Monitoring Information), Condition 37 (Road Signs), Condition 39 (Archaology) and Condition 42 (Liaison Committee) from approved application Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Jul 2025
✓
Consultation
16 Jul 2025
Decision
Target date was 29 Aug 2025

Under consideration

No decision has been issued yet. A decision is expected by 29 Aug 2025.

The consultation period closed on 6 Aug 2025.

Site constraints 5

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 4; Coalfield, development low risk area; Green belt about 5 m away: South and West Yorkshire.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 18 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wakefield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wakefield
Application type
Discharge of Conditions Request
Received
4 Jul 2025
Validated
4 Jul 2025
Ward
South Elmsall And South Kirkby
Parish
South Elmsall
Case officer
Show
Target decision
29 Aug 2025
Applicant
Show
Agent
MWP Planning

Public comments

No public comments yet.

Last counted 22 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14138256
Planning Portal ref
PP-14138256
Consultation
16 Jul 2025
Comments by
6 Aug 2025
Statutory expiry
29 Aug 2025
Env. assessment
No
Wakefield
Planning Authority Score
3.6/10
Below average
#217 of 296 councils
Relevant to this application:
Householder decisions

Wakefield is slower than most councils at deciding householder applications, ranking #223 out of 296. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Wakefield decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #95 of 296
95%
Householder approved
Above avg (90%) #94 of 296
53%
Decided in 8 weeks
Below avg (63%) #223 of 296
56%
Extended time limit
Above avg (41%) #256 of 296
89%
Minor dwellings approved
79 decided (1-9 homes)
92%
Major dwellings approved
24 decided (10+ homes)
85%
Change of use approved
74 decided
1,084
Total decisions
88 refused in the year to March 2026