Land Off Killingworth Lane Killingworth Newcastle Upon Tyne Data via plota.co.uk

26/00030/COND - Discharge of condition Awaiting decision

Proposal

Part discharge of Conditions 30 (boundary treatment A19), 44 (levels for dwellings), 45 (materials), 46 (means of enclosure), 49 (Construction surface water management plan) , 60 (badger checking survey), 62 (bird features), 64 (bat features), 65 (hedgehog gaps), 69 (pedestrian links to wagonway), 72 (temporary surface water drainage) & 73 (pollution control plan) for residential phase 1 only of planning approval (amended plans 24.02.26 & 08.04.26 relating to conditions 30, 46 and 69) (amended plans 17.08.26 for conditions 30, 46, 69)) Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
9 Jan 2026
Validated
12 Jan 2026
Consultation
21 Aug 2026
Decision
Expected by 9 Mar 2026

This application is under consideration - no decision has been issued yet. A decision is expected by 9 Mar 2026. Comments are open until 12 Sept 2026.

Comment on this application ↗

Documents 49

Plans & drawings 34

PDF LANDSCAPE PHASING PLAN) (C1 Drawing · 8 Apr 2026 View ↗ PDF BOUNDARY TREATMENT PLAN - SH. 2 (C3) Drawing · 8 Apr 2026 View ↗ PDF BOUNDARY TREATMENT PLAN - SH. 3 (C3) Drawing · 8 Apr 2026 View ↗ PDF BOUNDARY TREATMENT PLAN - SH. 4 (C3 Drawing · 8 Apr 2026 View ↗ PDF MANAGEMENT PLAN - A19 Drawing · 8 Apr 2026 View ↗ PDF KILLINGWORTH - SECTION PLAN - A19 Drawing · 8 Apr 2026 View ↗ PDF OPEN BOARDED GATE DETAIL Drawing · 8 Apr 2026 View ↗ PDF BOUNDARY TREATMENT PLAN - SH. 1 Drawing · 8 Apr 2026 View ↗ PDF A19 BOUNDARY MANAGEMENT PLAN C2 Drawing · 24 Feb 2026 View ↗ PDF BOUNDARY TREATMENT PLAN - A19 (C1) Drawing · 24 Feb 2026 View ↗ PDF BOUNDARY TREATMENT PLAN - SHEET 1 (C2) Superseded · 24 Feb 2026 View ↗ PDF BOUNDARY TREATMENT PLAN - SHEET 2 (C2) Superseded · 24 Feb 2026 View ↗ PDF BOUNDARY TREATMENT PLAN - SHEET 3 (C2) Superseded · 24 Feb 2026 View ↗ PDF BOUNDARY TREATMENT PLAN - SHEET 4 (C2) Superseded · 24 Feb 2026 View ↗ PDF KERBS, FOOTWAYS, PAVE AREAS Drawing · 24 Feb 2026 View ↗ PDF EXTERNAL FINISHES AND BOUNDARY TREATMENTS Drawing · 24 Feb 2026 View ↗ PDF WAGONWAY CONNECTIVITY PLAN C2 Drawing · 10 Feb 2026 View ↗ PDF BOUNDARY TREATMENT PLAN - SHEET 1 Superseded Drawing · 9 Jan 2026 View ↗ PDF BOUNDARY TREATMENT PLAN - SHEET 2 Superseded Drawing · 9 Jan 2026 View ↗ PDF BOUNDARY TREATMENT PLAN - SHEET 3 Superseded Drawing · 9 Jan 2026 View ↗ PDF BOUNDARY TREATMENT PLAN - SHEET 4 Superseded Drawing · 9 Jan 2026 View ↗ PDF SD100 (NE) EXTERNAL DETAILING Superseded Drawing · 9 Jan 2026 View ↗ PDF EXTERNAL LEVELS SHEET 1 Drawing · 9 Jan 2026 View ↗ PDF EXTERNAL LEVELS SHEET 2 Drawing · 9 Jan 2026 View ↗ PDF EXTERNAL LEVELS SHEET 3 Drawing · 9 Jan 2026 View ↗ PDF EXTERNAL LEVELS SHEET 4 Drawing · 9 Jan 2026 View ↗ PDF EXTERNAL LEVELS SHEET 5 Drawing · 9 Jan 2026 View ↗ PDF EXTERNAL FINISHES & BOUNDARY TREATMENTS PLAN - SH.1 Drawing · 9 Jan 2026 View ↗ PDF EXTERNAL FINISHES & BOUNDARY TREATMENTS PLAN - SH. 2 Drawing · 9 Jan 2026 View ↗ PDF EXTERNAL FINISHES & BOUNDARY TREATMENTS PLAN - SH. 3 Drawing · 9 Jan 2026 View ↗ PDF EXTERNAL FINISHES & BOUNDARY TREATMENTS PLAN - SH. 4 Drawing · 9 Jan 2026 View ↗ PDF HEDGEHOG HIGHWAY DETAILS Drawing · 9 Jan 2026 View ↗ PDF WW CONNECTIVITY PLAN (C1) Superseded Drawing · 9 Jan 2026 View ↗ PDF SURFACE WATER MANAGEMENT PLAN Other · 9 Jan 2026 View ↗

All documents on the council site ↗

Associated applications 5

Site constraints 1

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Tyneside - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge of condition
Postcode
NE27 0BB
Received
9 Jan 2026
Validated
12 Jan 2026
Ward
Killingworth
Parish
North West
Case officer
Show
Target decision
9 Mar 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Lichfields

Public comments

No public comments yet.

Last counted 10 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14612458
Consultation
21 Aug 2026
Comments by
12 Sept 2026
Statutory expiry
9 Mar 2026
Env. assessment
No
North Tyneside
Planning Authority Score
8.9/10
Excellent
#8 of 296 councils
Relevant to this application:
Householder decisions

North Tyneside is faster than most councils at deciding householder applications, ranking #35 out of 296. Only 25% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North Tyneside decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #5 of 296
97%
Householder approved
Above avg (90%) #36 of 296
81%
Decided in 8 weeks
Above avg (63%) #35 of 296
25%
Extended time limit
Below avg (41%) #31 of 296
100%
Minor dwellings approved
5 decided (1-9 homes)
83%
Major dwellings approved
6 decided (10+ homes)
91%
Change of use approved
56 decided
616
Total decisions
20 refused in the year to March 2026