National Trust Information Centre Quay Lane Morston Holt Norfolk NR25 7DJ Data via plota.co.uk

PF/26/0410 - Full Planning Permission Approved

Proposal

Erection of a building, to replace temporary toilets, including a changing places facility and shower, repurposing of existing brick-built toilets to storage and plant room. Foul drainage installation to replace existing septic tank arrangement, alterations to improve drainage and accessibility within the car park site, landscaping and associated works. Retention of temporary toilets until replacement toilets are operational. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Feb 2026
✓
Validated
27 Feb 2026
✓
Consultation
16 Jun 2026
✓
Approved
9 Jul 2026

Approved on 9 Jul 2026 · Delegated Decision · Last checked 10 Jul 2026

Documents 36

All documents on the council site ↗

Site constraints 11

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Norfolk Coast National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Public footpath about 8 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Heritage coast: North Norfolk
A defined stretch of undeveloped coastline.
Development inconsistent with keeping the coast undeveloped is resisted.
Special area of conservation about 4 m away: Blakeney
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Coastal saltmarsh
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 95 m away: North Norfolk Coast SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Conservation area about 26 m away: Morston; 5 listed buildings within 150 m of the postcode pin; Priority habitat about 4 m away: Coastal saltmarsh.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Norfolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
NR25 7DJ
Received
19 Feb 2026
Validated
27 Feb 2026
Ward
Coastal
Parish
Morston
Case officer
Show
Target decision
24 Apr 2026
Decision
Approve
Decision date
9 Jul 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 132 days from validation, 59 days slower than North Norfolk's median of 73 for commercial and major works. Approved, as 88% of commercial and major works here are.

34%decided within 8 weeks
88%approved
51decided in the last year

Plota live figures for commercial and major works decided by North Norfolk in the last twelve months, from validation. North Norfolk decision record →

Consultation & key dates

Alt. reference
PP-14681008
Planning Portal ref
PP-14681008
Consultation
16 Jun 2026
Comments by
7 Jul 2026
Site or press notice
16 Apr 2026
Statutory expiry
24 Apr 2026
Env. assessment
No
North Norfolk
Planning Authority Score
5.4/10
Average
#125 of 296 councils
Relevant to this application:
Householder decisions

North Norfolk ranks #175 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
North Norfolk decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #43 of 296
96%
Householder approved
Above avg (90%) #56 of 296
61%
Decided in 8 weeks
Below avg (63%) #175 of 296
44%
Extended time limit
Above avg (41%) #183 of 296
85%
Minor dwellings approved
113 decided (1-9 homes)
81%
Major dwellings approved
16 decided (10+ homes)
85%
Change of use approved
34 decided
906
Total decisions
56 refused in the year to March 2026