Land Near Brun Clough Huddersfield Road Diggle Oldham Data via plota.co.uk

NIT/356727/26 - Notice of intention temp campsite Approved

Proposal

Notification of intention to operate a temporary campsite comprising 40 pitches and temporary infrastructure under Class BC, Part 4, Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Aug 2026
✓
Approved
21 Aug 2026

Approved on 21 Aug 2026 · Development Control Delegation · Last checked 4 Sept 2026

Site constraints 11

Peak District National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Public bridleway 9 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Special protection area 11 m away: South Pennine Moors Phase 2
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Agricultural land, grade 5
Very poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
SSSI 11 m away: South Pennine Moors SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Restorable Habitat
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Coalfield, development low risk area; Green belt 2 m away: Merseyside and Greater Manchester; Priority habitat 10 m away: Grass moorland; Open access land 3 m away: Access Land - Combined Open Country, Registered Common Land and Section 16 Dedicated Land. MoD Byelaw, Section 28 Exclusions, Racecourses and Aerodromes and ECP Margin have been removed..
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Oldham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Oldham
Application type
Notice of intention temp campsite
Received
18 Aug 2026
Validated
18 Aug 2026
Case officer
Show
Target decision
15 Sept 2026
Decision
Application Noted
Decision date
21 Aug 2026
Decision level
Development Control Delegation
Applicant
Show

How this decision compares

Decided in 3 days from validation, 57 days faster than Oldham's median of 60 for changes of use. Approved, as 93% of changes of use here are.

40%decided within 8 weeks
93%approved
73decided in the last year

Plota live figures for changes of use decided by Oldham in the last twelve months, from validation. Oldham decision record →

Public comments

11comments received
11 objecting

100% object · above the UK average of 74%

Last counted 4 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
Email
Statutory expiry
15 Sept 2026
Env. assessment
No
Oldham
Planning Authority Score
2.3/10
Poor
#262 of 296 councils
Relevant to this application:
Householder decisions

Oldham is slower than most councils at deciding householder applications, ranking #257 out of 296. The council extends the time limit on 59% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Oldham decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #140 of 296
92%
Householder approved
Above avg (90%) #162 of 296
44%
Decided in 8 weeks
Below avg (63%) #257 of 296
59%
Extended time limit
Above avg (41%) #265 of 296
74%
Minor dwellings approved
47 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
87%
Change of use approved
89 decided
821
Total decisions
93 refused in the year to March 2026