7 Clockhouse Lane Romford RM5 3PH Data via plota.co.uk

Proposal

Installation of a commercial kitchen extractor system and associated flue on rear elevation. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Jul 2026
✓
Approved
15 Sept 2026

Approved on 15 Sept 2026 · Last checked 16 Sept 2026

Site constraints 4

Air quality management area: Havering AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Collier Row
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Also on the record
Inside the Havering built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area70 m² (753 sq ft)
Energy ratingB (asset rating 44)
UseRetail/Financial and Professional Services
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in October 2025, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Havering - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Havering
Postcode
RM5 3PH
Received
6 Jul 2026
Validated
6 Jul 2026
Ward
Havering-atte-Bower
Case officer
Show
Target decision
15 Sept 2026
Decision
Apprv with cons Conditions/Reasons
Decision date
15 Sept 2026
Applicant
Show
Agent
Other - Cityscape PTA

How this decision compares

Decided in 71 days from validation, 8 days slower than Havering's median of 63 for utility and infrastructure works. Approved, as 83% of utility and infrastructure works here are.

34%decided within 8 weeks
83%approved
31decided in the last year

Plota live figures for utility and infrastructure works decided by Havering in the last twelve months, from validation. Havering decision record →

Havering
Planning Authority Score
2.5/10
Poor
#251 of 296 councils
Relevant to this application:
Householder decisions

Havering is slower than most councils at deciding householder applications, ranking #202 out of 296. 47% of applications have the time limit extended, above the 41% national average. Havering is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.

One of the strictest councils
only 83% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Havering decision statistics
Based on MHCLG data, the year to March 2026
74%
Overall approval rate
Below avg (87%) #290 of 296
83%
Householder approved
Below avg (90%) #262 of 296
56%
Decided in 8 weeks
Below avg (63%) #202 of 296
47%
Extended time limit
Above avg (41%) #207 of 296
42%
Minor dwellings approved
156 decided (1-9 homes)
83%
Major dwellings approved
12 decided (10+ homes)
29%
Change of use approved
101 decided
1,501
Total decisions
385 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.