Woodland Grove, 2-106 (Evens), Woodland Grove, 2-106 (Evens), Greenwich, London, SE10 9UL Data via plota.co.uk

26/2060/NM - Non Material Approved

Proposal

An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with the Planning Permission dated 25/02/2026, Planning Ref 25/2821/MA for Renewal works to existing balustrades, walkway finishes and window and door replacement., To allow: - general need tenants choice of entrance door colours Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Jul 2026
✓
Validated
23 Jul 2026
✓
Approved
20 Aug 2026

Approved on 20 Aug 2026 · Delegation · Last checked 24 Aug 2026

Associated applications 2

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Greenwich AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 98 m away: Thames Tideway Tunnel
The site is 98 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, 1015 m); London Strategic Heat Main Project (at pre-application, 42 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; World heritage site 222 m away: Maritime Greenwich; Inside the Greenwich built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square; Town centre 35 m away: East Greenwich.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area112 m² (1,206 sq ft)
Energy ratingA (101 out of 100)
PropertyEnd-terrace house
Built2025
HeatingAir source heat pump, radiators, electric
WallsAverage thermal transmittance 0.17 W/m²K

From the energy performance certificate lodged in March 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Greenwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Greenwich
Application type
Non Material
Postcode
SE10 9UL
Received
13 Jul 2026
Validated
23 Jul 2026
Ward
EAST GREENWICH
Parish
Greenwich
Case officer
Show
Target decision
20 Aug 2026
Decision
Approve
Decision date
20 Aug 2026
Decision level
Delegation
Applicant
Show
Agent
Martin Arnold Ltd

Public comments

No public comments yet.

Last counted 24 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15066271
Planning Portal ref
PP-15066271
Statutory expiry
20 Aug 2026
Env. assessment
No
Greenwich
Planning Authority Score
5.4/10
Average
#123 of 296 councils
Relevant to this application:
Householder decisions

Greenwich is faster than most councils at deciding householder applications, ranking #76 out of 296. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Greenwich is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Greenwich decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #278 of 296
78%
Householder approved
Below avg (90%) #287 of 296
75%
Decided in 8 weeks
Above avg (63%) #76 of 296
29%
Extended time limit
Below avg (41%) #49 of 296
60%
Minor dwellings approved
114 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
66%
Change of use approved
195 decided
1,468
Total decisions
331 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.