SMI/2026/35 - SMI Application Registered application

Proposal

Proposed south-western extension to Langley Quarry for the extraction of sand an Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Oct 2026
✓
Consultation
27 Oct 2026
Decision
Expected by 26 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 21 Dec 2026, from Slough's recent commercial premises.

Site constraints 7

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Tree preservation order
Consent is needed before work on protected trees.
Not every council has published its orders as open data, so no order shown is not proof there is none.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 1. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Air quality management area: South Bucks District Council AQMA No 2
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 546 m away: M4 Junctions 3 to 12 Smart Motorway
The site is about 546 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Expansion of Heathrow Airport (Third Runway) (at pre-application, about 32 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Priority habitat about 35 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 27 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Slough - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Slough
Application type
SMI Application
Postcode
SL0 9DL
Received
27 Oct 2026
Validated
27 Oct 2026
Target decision
26 Nov 2026
Applicant
Show

Decision outlook

Day 2 of the 56-day target. Slough usually decides commercial premises by day 55.

Day 254 days to the 56-day target
61%decided within 8 weeks
89%approved
57decided in the last year

Plota live figures for commercial premises decided by Slough in the last twelve months, from validation. Slough decision record →

Consultation & key dates

Site or press notice
27 Oct 2026
Slough
Planning Authority Score
2.4/10
Poor
#260 of 296 councils
Relevant to this application:
Householder decisions

Slough is slower than most councils at deciding householder applications, ranking #263 out of 296. Slough is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Slough decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #275 of 296
82%
Householder approved
Below avg (90%) #269 of 296
42%
Decided in 8 weeks
Below avg (63%) #263 of 296
39%
Extended time limit
Below avg (41%) #142 of 296
60%
Minor dwellings approved
48 decided (1-9 homes)
50%
Major dwellings approved
4 decided (10+ homes)
40%
Change of use approved
47 decided
617
Total decisions
137 refused in the year to March 2026