Unit 1 and 2 , Milton Works , Bowden Lane , Chapel-En-Le-Frith , Derbyshire , SK23 0QG Data via plota.co.uk

HPK/2026/0394 Application Invalid

Proposal

Extension to existing commercial unit to form additional Class E space as additional unit Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Oct 2026
Decision
Expected by 30 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 10 Dec 2026 and 9 Jan 2027, from High Peak's recent commercial premises.

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Chapel Milton conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Flood defence about 12 m from the postcode pin (natural high ground, designed for a 1 in 5 year flood); National park about 388 m away: Peak District; National infrastructure project about 1746 m away: Peak Cluster CCS Pipeline, at pre-application.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in High Peak - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
High Peak
Postcode
SK23 0QG
Received
5 Oct 2026
Applicant
Show
Agent
AJS ARCHITECTURE

Decision outlook

Day 4 of the 56-day target. High Peak usually decides commercial premises by day 70.

Day 466 days to the predicted decision (day 70)
26%decided within 8 weeks
78%approved
31decided in the last year

Plota live figures for commercial premises decided by High Peak in the last twelve months, from validation. High Peak decision record →

High Peak
Planning Authority Score
1.2/10
Poor
#287 of 296 councils
Relevant to this application:
Householder decisions

High Peak is one of the slowest councils in England for householder decisions, ranking #284 out of 296. The council extends the time limit on 73% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
High Peak decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #207 of 296
89%
Householder approved
Below avg (90%) #204 of 296
29%
Decided in 8 weeks
Below avg (63%) #284 of 296
73%
Extended time limit
Above avg (41%) #291 of 296
78%
Minor dwellings approved
32 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
89%
Change of use approved
18 decided
364
Total decisions
55 refused in the year to March 2026