Shelton Farm, Lower Shelton Road, Marston Moreteyne, MK43 0LP Data via plota.co.uk
Proposal
Erection of a pair of semi-detached houses. Data via plota.co.uk
Application progress
Approved on 19 Sept 2025 · Last checked 16 Oct 2026
Associated applications 3
Site constraints 3
Checked on 14 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Sales history 3
Last sold for £430,000 in June 2016. Detached house, freehold.
Sale prices from HM Land Registry's price paid record, matched to this application by its address.
Building
From the energy performance certificate lodged in April 2009, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate
Every application in Central Bedfordshire - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
Important details
- Council
- Central Bedfordshire
- Application type
- Full Application
- Postcode
- MK43 0LP
- Received
- 26 Jun 2025
- Validated
- 16 Jul 2025
- Parish
- Marston Moreteyne
- Case officer
- Show
- Target decision
- 10 Sept 2025
- Decision
- Full Application - Granted Conditions or Reasons: View Conditions or Reasons Informative Notes: 1 )GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF). 2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. 3 )You are advised to note the comments of the CBC SuDS Officer in relation to condition 6 as set out below: Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.You are advised to note the comments of the CBC SuDS Officer in relation to condition 6 as set out below: Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate. 4 )You are reminded that the land is covered by a S106 legal agreement attached to planning permission CB/16/05797/OUT which requires the provision of affordable housing through a commuted sum and review mechanism.You are reminded that the land is covered by a S106 legal agreement attached to planning permission CB/16/05797/OUT which requires the provision of affordable housing through a commuted sum and review mechanism. 5 )It is noted that than an existing footpath within the Council's mapping system runs through this site. The applicant is reminded that in order to resolve this a public path diversion order would need to be applied for and to contact the Definitive Map team: Definitivemap@centralbedfordshire.gov.uk . This would prevent the footpath from showing on future searches.It is noted that than an existing footpath within the Council's mapping system runs through this site. The applicant is reminded that in order to resolve this a public path diversion order would need to be applied for and to contact the Definitive Map team: Definitivemap@centralbedfordshire.gov.uk . This would prevent the footpath from showing on future searches.
- Decision date
- 19 Sept 2025
- Agent
- Show
How this decision compares
Decided in 65 days from validation, 10 days slower than Central Bedfordshire's median of 55 for full applications. Approved, as 85% of full applications here are.
Plota live figures for full applications decided by Central Bedfordshire in the last twelve months, from validation. Central Bedfordshire decision record →
Public comments
Last counted 16 Oct 2026
Consultation & key dates
- Consultation
- 16 Jul 2025
- Comments by
- 22 Sept 2025
- Site or press notice
- 1 Aug 2025
Historical activity at this location
25 nearby applications on record - archival context, not part of the live application.
Nearby activity
Central Bedfordshire is faster than most councils at deciding householder applications, ranking #62 out of 296. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).
Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.
Track this application
Shelton Farm, Lower Shelton Road, Marston Moreteyne, MK43 0LP
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.