284 - 288 North End Road, London, SW6 1NH Data via plota.co.uk

P/2026/01392/NMAT - Non-Material Amendment Submission Approved

Proposal

Non-material amendment to planning permission reference: dated 8th February 2024 for the "Variation of Conditions 2, 32, 34, 42 and 46 to provide minor material amendments to planning permission ref: dated 8th December 2022, as amended by dated 16th May 2023, for the "Non-material amendment to planning permission ref: dated 8th December 2022 for the 'Variation of Condition 2 (approved drawings), Condition 34 (number of rooms), Condition 52 (Sustainable design and construction), Condition 53 (Carbon reduction) and Condition 57 (number of rooms), and removal of Condition 35 (breakfast room) to allow minor material amendments to planning permission ref: dated 29 March 2019, as amended by , for the "Demolition of existing building, and redevelopment of the site to provide a hotel (Use Class C1) and retail unit at ground floor level (Use Class E(a) the display or retail sale of goods, other than hot food).' Amendments sought are for: change from 100 bed hotel to 39 bed apart-hotel (Class C1); enlargement of ground floor refuse store by 2.2m in length along the side elevation facing Bucklers Alley; excavation of a single storey basement instead of two floors; and minor adjustment of window positionings. Non-material amendment sought is the alteration of the description of development for the retail unit from Class E(a) to Class E." Amendments sought are to facilitate the inclusion of Class E(b) for the ground floor retail unit and the inclusion of an additional two apart-hotel bedrooms in the basement." Amendments sought are alterations to the internal configuration of the new development including minor reconfiguration of the waste storage to include separated hotel and retail waste rooms; minor reconfiguration of central circulation area, including lobby access, location of accessible toilet, bike storage design; and two x new access panels on the south elevation to facilitate ductwork maintenance. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 May 2026
✓
Validated
29 May 2026
✓
Approved
27 Jul 2026

Approved on 27 Jul 2026 · Last checked 21 Sept 2026

Associated applications 10

Site constraints 8

Grade II listed: Gate Piers to No 282
List entry 1079796 · 26 m away · 1 more listed building within 150 m (1 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other one with distances
Historic England ↗
Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Fulham Town Centre
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
National infrastructure project 882 m away: Thames Tideway Tunnel
The site is 882 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Conservation area 57 m away: Walham Green; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-Material Amendment Submission
Postcode
SW6 1NH
Received
28 May 2026
Validated
29 May 2026
Ward
Lillie|Walham Green
Case officer
Show
Decision
Application Approved
Decision date
27 Jul 2026
Applicant
Show

Public comments

No public comments yet.

Read the comments on the council site ↗

Consultation & key dates

Consultation
29 May 2026
Statutory expiry
26 Jun 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026