Lands directly south of the junction of Cam Road and Ringsend Road, Limavady (approximately 400m east of 153… Data via plota.co.uk

LA01/2026/0733/F - Full Consultation Open

Proposal

Full permission for a new Cluster Substation to comprise of the following elements: - Hardstand area of approximately 20,000m2 and associated vehicular access from Craigmore/Ringsend Road. - Earthworks, drainage infrastructure and landscape planting. - Electrical infrastructure comprising of two transformers, fifteen 110kV bays sufficient for five circuits, two bus-couplers, mid-section switches and four future spares. - Switch house, control room and ancillary facilities. - Works to facilitate the connection of both existing Coolkeeragh - Coleraine and Limavady - Coleraine 110kV overhead circuits, via underground cables and terminal tower structures. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Jun 2026
✓
Validated
9 Jul 2026
✓
Consultation
3 Aug 2026
Decision
Expected by 3 Sept 2026

This application is under consideration - no decision has been issued yet. Plota predicted a decision around 5 Oct 2026; it is now day 88. The consultation period closed on 5 Aug 2026.

Documents 60

Plans & drawings 21

PDF Site Location Plan (Aerial) A3 Site Location Plan · 9 Jul 2026 View ↗ PDF Site Location Plan (Vector) A3 Site Location Plan · 9 Jul 2026 View ↗ PDF Proposed Site Layout Plan A1 Site Layout or Block Plan · 9 Jul 2026 View ↗ PDF Cam Cluster Proposed Layout A1 Site Layout or Block Plan · 9 Jul 2026 View ↗ PDF Switch House Plans and Elevations A0 Proposed Elevations and Floor Plans · 9 Jul 2026 View ↗ PDF Proposed Layout Sections A1 Cross Sections · 9 Jul 2026 View ↗ PDF Chainage and Levels A3 Site & Detailed Drawings · 9 Jul 2026 View ↗ PDF Visibility Splays A3 Site & Detailed Drawings · 9 Jul 2026 View ↗ PDF Typical 33kV Circuit Cross-Section A4 Cross Sections · 9 Jul 2026 View ↗ PDF Typical Trench Cross Section for Double Circuit - Ducted B A4 Cross Sections · 9 Jul 2026 View ↗ PDF Typical Trench Cross Section for Single Circuit - Ducted B A4 Cross Sections · 9 Jul 2026 View ↗ PDF 33kV H-Pole with HV Cable Riser A4 Proposed Plans · 9 Jul 2026 View ↗ PDF AP1 30-60 Degree H Pole General Arrangement A3 Proposed Plans · 9 Jul 2026 View ↗ PDF AP1 Inline Section H Pole General Arrangement A3 Proposed Plans · 9 Jul 2026 View ↗ PDF General Arrangement of Quad Trays A3 Proposed Plans · 9 Jul 2026 View ↗ PDF Sealing End Platform General Arrangement A2 Proposed Plans · 9 Jul 2026 View ↗ PDF GA and ED of Terminal Tower E3 Extension A1 Proposed Plans · 9 Jul 2026 View ↗ PDF GA and ED of Terminal Tower Standard A1 Proposed Plans · 9 Jul 2026 View ↗ PDF Cam Cluster - HGV Swept Path A3 Site & Detailed Drawings · 9 Jul 2026 View ↗ PDF Outline Construction Environmental Management Plan (R) Other Supporting Information · 9 Jul 2026 View ↗ PDF Environmental Report 12. LVIA - Part 4 (Landscape Mitigation Plan) Other Supporting Information · 9 Jul 2026 View ↗

Other documents 18

PDF Landscape Proposals A1 Landscaping Proposals · 9 Jul 2026 View ↗ PDF Soni Cam Cluster PACC Report Other Supporting Information · 9 Jul 2026 View ↗ PDF Environmental Report: 1. Introduction Other Supporting Information · 9 Jul 2026 View ↗ PDF Environmental Report: 2. Project Description and Project Need Other Supporting Information · 9 Jul 2026 View ↗ PDF Environmental Report: 3. Consideration of Alternatives Other Supporting Information · 9 Jul 2026 View ↗ PDF Environmental Report: 5. Ornithology Other Supporting Information · 9 Jul 2026 View ↗ PDF Environmental Report: 6. Water Quality Other Supporting Information · 9 Jul 2026 View ↗ PDF Environmental Report: 8. Human Health Other Supporting Information · 9 Jul 2026 View ↗ PDF Environmental Report: 9. Air Quality Other Supporting Information · 9 Jul 2026 View ↗ PDF Environmental Report: 14. Geology, Soils & Contaminated Land - Part 1 Other Supporting Information · 9 Jul 2026 View ↗ PDF Environmental Report: 14. Geology, Soils & Contaminated Land - Part 2 Other Supporting Information · 9 Jul 2026 View ↗ PDF Environmental Report: 15. Construction and Dust Management Other Supporting Information · 9 Jul 2026 View ↗ PDF Environmental Report: 16. Climate Change Other Supporting Information · 9 Jul 2026 View ↗ PDF Environmental Report 12. LVIA - Part 1 Other Supporting Information · 9 Jul 2026 View ↗ PDF Environmental Report 12. LVIA - Part 2 (Photomontages) Other Supporting Information · 9 Jul 2026 View ↗ PDF Environmental Report 12. LVIA - Part 3 (Photomontages) Other Supporting Information · 9 Jul 2026 View ↗ PDF Application Cover Letter (R) Other Supporting Information · 9 Jul 2026 View ↗ PDF Acknowledge Application Correspondence with Applicant/Agent/Solicitor · 9 Jul 2026 View ↗

All documents on the council site ↗

Work with planning data?

Every application in Causeway and Glens - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
BT49 0QN
Received
23 Jun 2026
Validated
9 Jul 2026
Ward
Magilligan
Applicant
Show
Agent
Tetra Tech

Decision outlook

Day 88, past the statutory target. 65% of full applications in Causeway and Glens are decided within thirteen weeks, which runs to 8 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 2 Oct 2026.

Day 8832 days past the 56-day target
35%decided within 8 weeks
98%approved
148decided in the last year

Plota live figures for full applications decided by Causeway and Glens in the last twelve months, from validation. Causeway and Glens decision record →

Consultation & key dates

Planning Portal ref
PP-14984111
Consultation
3 Aug 2026
Comments by
5 Aug 2026
Site or press notice
22 Jul 2026