The Thatched House Milton Locks Southsea Data via plota.co.uk

26/01038/ADV - Advert Application Awaiting decision

Proposal

Display of 1 illuminated totem sign, 3 illuminated fascia signs, 1 non illuminated plaque, 2 non illuminated totem sign, 1 non illuminated fascia sign, 1 non illuminated directional sign Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Sept 2026
✓
Validated
16 Sept 2026
✓
Consultation
7 Oct 2026
Decision
Expected by 11 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 9 Nov 2026, from Portsmouth's recent signs and adverts.

Comments are open until 31 Oct 2026

Comment on this application ↗

Site constraints 11

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Special area of conservation 30 m away: Solent Maritime
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
National infrastructure project 21 m away: AQUIND Interconnector
The site is 21 m from the project boundary. Electricity line, awaiting the Secretary of State's decision. Also within 2 km: Hampshire Water Transfer and Water Recycling Project (accepted for examination, 493 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
SSSI 30 m away: Langstone Harbour SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Portsmouth to South Hayling 23 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
Also on the record
Conservation area 28 m away: Milton Locks; 1 listed building within 150 m; Inside the Portsmouth built-up area; Priority habitat 30 m away: Mudflats.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Advert Application
Received
7 Sept 2026
Validated
16 Sept 2026
Ward
Milton
Target decision
11 Nov 2026
Decision level
Delegated
Applicant
Show
Agent
Ashleigh Signs

Decision outlook

Day 42 of the 56-day target. Portsmouth usually decides signs and adverts by day 54.

Day 4214 days to the 56-day target
64%decided within 8 weeks
92%approved
67decided in the last year

Plota live figures for signs and adverts decided by Portsmouth in the last twelve months, from validation. Portsmouth decision record →

Public comments

No public comments yet.

5 neighbours consulted · Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15209383
Planning Portal ref
PP-15209383
Neighbours
7 Oct 2026
Consultation
7 Oct 2026
Comments by
31 Oct 2026
Site or press notice
10 Oct 2026
Statutory expiry
11 Nov 2026
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 councils
Relevant to this application:
Other decisions

Portsmouth ranks #188 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use