The Bungalow, Olands House, Milverton Data via plota.co.uk

23/25/0059 - Full Planning Permission Approved

Proposal

Erection of single storey extensions to the rear and side and erection of detached double carport with store at The Bungalow, Olands House, Milverton Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Dec 2025
✓
Approved
2 Jul 2026

Approved on 2 Jul 2026 · the Development Control Manager under delgated powers · Last checked 25 Oct 2026

Site constraints 5

2 listed buildings within 150 m of the postcode pin
Nearest: Walls Enclosing Garden to West of Olands, and Boundary Wall to the North, Fronting Butts Way, Grade II, about 21 m from the postcode pin · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Nutrient neutrality catchment: Tone Catchment
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Also on the record
Inside the Milverton built-up area; Conservation area about 94 m away: Milverton; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 14 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Taunton Deane - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Received
17 Dec 2025
Validated
17 Dec 2025
Parish
Milverton
Case officer
Show
Target decision
11 Feb 2026
Decision
Conditional Approval
Decision date
2 Jul 2026
Decision level
the Development Control Manager under delgated powers
Applicant
Show
Agent
K R ARCHITECTURAL DESIGN

How this decision compares

Decided in 197 days from validation, 131 days slower than Taunton Deane's median of 66 for full applications. Approved, as 86% of full applications here are.

38%decided within 8 weeks
86%approved
317decided in the last year

Plota live figures for full applications decided by Taunton Deane in the last twelve months, from validation. Taunton Deane decision record →

Consultation & key dates

Consultation
19 Dec 2025
Comments by
9 Jan 2026