138-140, Nathan Way, Thamesmead, London, SE28 0AU Data via plota.co.uk

26/2593/SD - Submission of Details 8 Weeks Awaiting decision

Proposal

Submission of details pursuant to the discharge of Condition 10 (External Materials) and 11 (Architectural Details) of planning permission 25/2323/F dated 12/02/2026. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Sept 2026
✓
Consultation
10 Sept 2026
Decision
Expected by 30 Oct 2026

Under consideration

No decision has been issued yet. A decision is expected by 30 Oct 2026.

Documents 38

Plans & drawings 35

PDF External materials - sheet 1 Drawing · 7 Sept 2026 View ↗ PDF Proposed elevations- sheet 02 Drawing · 7 Sept 2026 View ↗ PDF Proposed elevations -sheet 01 Drawing · 7 Sept 2026 View ↗ PDF Da118-wall window head detail on gridline 1 Drawing · 7 Sept 2026 View ↗ PDF Da117-wall loading door jamb detail on gridline 11 Drawing · 7 Sept 2026 View ↗ PDF Da124-wall window cill detail on gridline a (with feature surround) Drawing · 7 Sept 2026 View ↗ PDF Da123-wall window head detail on gridline a (with feature surround) Drawing · 7 Sept 2026 View ↗ PDF Da122-wall escape door jamb detail on gridline 11 Drawing · 7 Sept 2026 View ↗ PDF Da121-wall escape door head detail on gridline 11 Drawing · 7 Sept 2026 View ↗ PDF Da120-wall window jamb detail on gridline 1 Drawing · 7 Sept 2026 View ↗ PDF Da119-wall window cill detail on gridline 1 Drawing · 7 Sept 2026 View ↗ PDF Da114-wall vertical composite to curtain walling plan detail on gridline 1 Drawing · 7 Sept 2026 View ↗ PDF Da110-wall horizontal built-up external corner detail Drawing · 7 Sept 2026 View ↗ PDF Da113-wall vertical built-up to vertical composite plan detail on gridline 1 Drawing · 7 Sept 2026 View ↗ PDF Da115-wall vertical built-up to horizontal built-up plan detail on gridline 1 Drawing · 7 Sept 2026 View ↗ PDF Da116-wall loading door head detail on gridline 11 Drawing · 7 Sept 2026 View ↗ PDF Da125-wall window jamb detail on gridline a (with feature surround) Drawing · 7 Sept 2026 View ↗ PDF Da105-wall vertical composite to horizontal composite section detail on gridline Drawing · 7 Sept 2026 View ↗ PDF Da107-wall vertical built-up to horizontal composite section detail on gridline Drawing · 7 Sept 2026 View ↗ PDF Da108-wall horizontal composite to vertical built-up section detail on gridline Drawing · 7 Sept 2026 View ↗ PDF Da109-wall vertical built-up external corner detail Drawing · 7 Sept 2026 View ↗ PDF Da111-wall horizontal composite external corner detail Drawing · 7 Sept 2026 View ↗ PDF Da112-wall vertical built-up to horizontal built-up internal corner detail Drawing · 7 Sept 2026 View ↗ PDF Da102-wall vertical composite base detail on gridline 1 Drawing · 7 Sept 2026 View ↗ PDF Da100-wall horizontal built-up base detail on gridline h Drawing · 7 Sept 2026 View ↗ PDF Da100-wall vertical built-up base detail on gridline a Drawing · 7 Sept 2026 View ↗ PDF Da103-wall vertical built-up to horizontal built-up section detail on gridline a Drawing · 7 Sept 2026 View ↗ PDF Da104-wall horizontal built-up to vertical built-up section detail on gridline 1 Drawing · 7 Sept 2026 View ↗ PDF Da106-wall horizontal composite to horizontal built-up section detail on gridlin Drawing · 7 Sept 2026 View ↗ PDF Fire exit doors - external singles - fire rated Drawing · 7 Sept 2026 View ↗ PDF Level access door details - 6300high Drawing · 7 Sept 2026 View ↗ PDF Fire exit doors - external singles Drawing · 7 Sept 2026 View ↗ PDF Typical window and curtain walling details - sheet 02 first floor Drawing · 7 Sept 2026 View ↗ PDF Typical window and curtain walling details - sheet 01 Drawing · 7 Sept 2026 View ↗ PDF Typical window and curtain walling details - sheet 03 feature frame Drawing · 7 Sept 2026 View ↗

All documents on the council site ↗

Associated applications 17

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Greenwich AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project 1238 m away: Thames Tideway Tunnel; Inside the Greenwich built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £3,970,000 in May 2025. Other property, freehold.

19 May 2025£3,970,000Recorded as a transfer outside a standard sale
20 October 2017£1,585,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area243 m² (2,616 sq ft)
Energy ratingD (asset rating 85)
UseNon-residential Institutions: Community/Day Centre
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in January 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Greenwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Greenwich
Application type
Submission of Details 8 Weeks
Postcode
SE28 0AU
Received
4 Sept 2026
Validated
4 Sept 2026
Ward
WEST THAMESMEAD
Parish
Woolwich & Thamesmead
Case officer
Show
Target decision
30 Oct 2026
Applicant
Show
Agent
Stantec
Freehold owner
Show

Public comments

No public comments yet.

Last counted 28 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15186985
Planning Portal ref
PP-15186985
Consultation
10 Sept 2026
Statutory expiry
30 Oct 2026
Env. assessment
No
Greenwich
Planning Authority Score
5.4/10
Average
#123 of 296 councils
Relevant to this application:
Householder decisions

Greenwich is faster than most councils at deciding householder applications, ranking #76 out of 296. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Greenwich is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Greenwich decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #278 of 296
78%
Householder approved
Below avg (90%) #287 of 296
75%
Decided in 8 weeks
Above avg (63%) #76 of 296
29%
Extended time limit
Below avg (41%) #49 of 296
60%
Minor dwellings approved
114 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
66%
Change of use approved
195 decided
1,468
Total decisions
331 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.