Sutton Hall Water Works Glencoe Road Great Sutton Ellesmere Port CH66 4NA Data via plota.co.uk

26/02719/DSM - DSLAM/Antenna Notification Approved

Proposal

The installation of 2no. antennas and 1no. GPS module, and the installation of 1no. cabinet within the existing equipment building; plus, ancillary equipment works (Your ref UUW_CH109) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Aug 2026
✓
Approved
25 Aug 2026

Approved on 25 Aug 2026 · Last checked 12 Sept 2026

Site constraints 3

Public footpath about 17 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Also on the record
National infrastructure project: Mersey Tidal Power Project, at pre-application; Inside the Ellesmere Port built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Chester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Chester
Application type
DSLAM/Antenna Notification
Postcode
CH66 4NA
Received
25 Aug 2026
Validated
25 Aug 2026
Ward
Ledsham And Manor
Decision
Notification Closed
Decision date
25 Aug 2026
Applicant
Show
Agent
Telent Technology Services Ltd

How this decision compares

Decided in 0 days from validation, about the council's usual 1 days. Approved, as 99% of utility and infrastructure works here are.

90%decided within 8 weeks
99%approved
89decided in the last year

Plota live figures for utility and infrastructure works decided by Chester in the last twelve months, from validation. Chester decision record →

Public comments

No public comments yet.

Last counted 12 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No