Enfield Ignatians Rugby Club Donkey Lane Enfield EN1 3PL Data via plota.co.uk

26/03962/FUL - Full Application in Progress

Proposal

Flootlights to Rugby pitch. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Sept 2026
✓
Validated
2 Oct 2026
✓
Consultation
13 Oct 2026
Decision
Expected by 27 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 15 Nov 2026 and 23 Nov 2026, from Enfield's recent community buildings.

Comments are open until 8 Nov 2026

Comment on this application ↗

Documents 30

Statements & assessments 24

PDF ENFIELD IGNATIANS RFC 200 LUX LED HORIZONTAL SPILLAGE ISO CONTOURS AT 4 METRES Lighting Assessment · 16 Sept 2026 View ↗ PDF 100 LUX HID LIGHTING DESIGN - EXISTING LIGHTING Lighting Assessment · 16 Sept 2026 View ↗ PDF ENFIELD IGNATIANS RFC 200 LUX LED HORIZONTAL SPILLAGE ISO CONTOURS AT 2 METRES Lighting Assessment · 16 Sept 2026 View ↗ PDF ENFIELD IGNATIANS RFC 200 LUX LED HORIZONTAL SPILLAGE ISO CONTOURS AT 0 METRES Lighting Assessment · 16 Sept 2026 View ↗ PDF ENFIELD IGNATIANS RFC 100 LUX HORIZONTAL SPILLAGE ISO CONTOURS AT 0 METRES Lighting Assessment · 16 Sept 2026 View ↗ PDF ENFIELD IGNATIANS RFC 100 LUX HORIZONTAL SPILLAGE RESULTS AT 0 METRES Lighting Assessment · 16 Sept 2026 View ↗ PDF 200 LUX LED LIGHTING DESIGN Lighting Assessment · 16 Sept 2026 View ↗ PDF ENFIELD IGNATIANS RFC APPROXIMATE PROPOSED COLUMN TO ADJACENT TREE STEM DIMENSIO Lighting Assessment · 16 Sept 2026 View ↗ PDF ENFIELD IGNATIANS RFC 200 LUX LED HORIZONTAL SPILLAGE RESULTS AT 8 METRES Lighting Assessment · 16 Sept 2026 View ↗ PDF ENFIELD IGNATIANS RFC 200 LUX LED HORIZONTAL SPILLAGE RESULTS AT 10 METRES Lighting Assessment · 16 Sept 2026 View ↗ PDF ENFIELD IGNATIANS RFC 200 LUX LED HORIZONTAL SPILLAGE RESULTS AT 4 METRES Lighting Assessment · 16 Sept 2026 View ↗ PDF ENFIELD IGNATIANS RFC 200 LUX LED HORIZONTAL SPILLAGE RESULTS AT 6 METRES Lighting Assessment · 16 Sept 2026 View ↗ PDF ENFIELD IGNATIANS RFC 200 LUX LED HORIZONTAL SPILLAGE ISO CONTOURS AT 6 METRES Lighting Assessment · 16 Sept 2026 View ↗ PDF ENFIELD IGNATIANS RFC 200 LUX LED HORIZONTAL SPILLAGE ISO CONTOURS AT 10 METRES Lighting Assessment · 16 Sept 2026 View ↗ PDF ENFIELD IGNATIANS RFC 200 LUX LED HORIZONTAL SPILLAGE RESULTS AT 0 METRES Lighting Assessment · 16 Sept 2026 View ↗ PDF ENFIELD IGNATIANS RFC 200 LUX LED HORIZONTAL SPILLAGE RESULTS AT 2 METRES Lighting Assessment · 16 Sept 2026 View ↗ PDF ENFIELD IGNATIANS RFC 200 LUX LED HORIZONTAL SPILLAGE ISO CONTOURS AT 8 METRES Lighting Assessment · 16 Sept 2026 View ↗ PDF OPTIVISION LED FLOODLIGHTS UNDERSTANDING OUR LOUVRES Supplementary Information · 16 Sept 2026 View ↗ PDF ENFIELD IGNATIANS RFC 200 LUX LED PROPOSED VERTICAL CALCULATIONS LOCATION + RESU Lighting Assessment · 16 Sept 2026 View ↗ PDF ENFIELD IGNATIANS RFC EXISTING VERTICAL CALCULATIONS LOCATION + RESULTS Lighting Assessment · 16 Sept 2026 View ↗ PDF ENFIELD IGNATIANS RFC FLOODLIGHTING LOCATION PLAN Lighting Assessment · 16 Sept 2026 View ↗ PDF HL250D15F FLOODLIGHTING COLUMN MOUNTING 2X PHILIPS OPTIVISION GEN3.5 LED FLOODL Lighting Assessment · 16 Sept 2026 View ↗ PDF PRELIMINARY ECOLOGICAL APPRAISAL Biodiversity Survey & Report · 16 Sept 2026 View ↗ PDF PLANNING, DESIGN AND ACCESS STATEMENT Design & Access Statement · 16 Sept 2026 View ↗

All documents on the council site ↗

Site constraints 8

Metropolitan Open Land
Green belt level protection inside London.
The London Plan gives Metropolitan Open Land the same protection as green belt: inappropriate development needs very special circumstances.
Article 4 direction
Borough wide. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Enfield AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
1 listed building within 150 m; Priority habitat 6 m away: Deciduous woodland; Inside the Enfield built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 15 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area296 m² (3,186 sq ft)
Energy ratingB (asset rating 37)
UseD2 General Assembly and Leisure plus Night Clubs and Theatres
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in January 2018, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Enfield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Enfield
Application type
Full
Postcode
EN1 3PL
Received
16 Sept 2026
Validated
2 Oct 2026
Ward
Southbury
Case officer
Show
Target decision
27 Nov 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Pentangle Design Group

Decision outlook

Day 26 of the 56-day target. Enfield usually decides community buildings by day 48.

Day 2630 days to the 56-day target
85%decided within 8 weeks
85%approved
52decided in the last year

Plota live figures for community buildings decided by Enfield in the last twelve months, from validation. Enfield decision record →

Public comments

No public comments yet.

20 neighbours consulted · Last counted 23 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15120492
Planning Portal ref
PP-15120492
Neighbours
15 Oct 2026
Consultation
13 Oct 2026
Comments by
8 Nov 2026
Statutory expiry
27 Nov 2026
Env. assessment
No
Enfield
Planning Authority Score
6.9/10
Good
#65 of 296 councils
Relevant to this application:
Householder decisions

Enfield is one of the fastest councils in England for householder decisions, ranking #15 out of 296. Only 5% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Enfield is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Enfield decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #271 of 296
83%
Householder approved
Below avg (90%) #260 of 296
90%
Decided in 8 weeks
Above avg (63%) #15 of 296
5%
Extended time limit
Below avg (41%) #1 of 296
60%
Minor dwellings approved
265 decided (1-9 homes)
63%
Major dwellings approved
8 decided (10+ homes)
72%
Change of use approved
322 decided
1,939
Total decisions
433 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.