Orion Park Northfield Avenue West Ealing W13 9SJ Data via plota.co.uk

262479VAR - Variation of Condition Pending Consideration

Proposal

Minor material amendments (S.73) to vary condition no. 2 (Approved Plans), 3 (Demolition and Site Clearance), 7 (Cycle Parking Spaces), 9 (Site Wide Car and Cycle Parking Management Strategy), 10 (Foundation Method Statement), 11 (Remediation), 13 (Drainage Strategy), 14 (Piling Method Statement),15 (Refuse and Recycling), 19 (Ultra-low Boilers), 22 (Passenger Lifts), 26 (Business Hours), 27 (Commercial Units Use Class), 28 (Bat Survey Report), 29 (BREEAM), 30 (Sustainability Measures), 32 (Dwelling Energy Performance Certificates), 33 (Commercial Spaces Energy Performance Certificates) and 34 (Children's Play Space) pursuant to planning permission reference 171721FUL dated 02.02.2018 as varied by 203596NMA dated 17.09.2020 and pursuant to 213744VAR dated 08.12.2021 for 'Construction of buildings comprising residential units (Use Class C3), flexible retail space (Use Class A1/A2) (at ground floor of the building fronting Northfield Avenue), office space (Use Class B1) (at ground and lower ground of the building fronting Northfield Avenue), landscaping, access and servicing, car parking and associated works (following demolition of existing buildings).' Variation seeks four additional residential units; reduction in non-residential floorspace; decreasing the height of Block A (from 8 storeys to 6 storeys) and increasing the height of Block C from (from 3 and 4 storeys to 4 and 5 storeys); internal alterations to allow for sprinkler tank infrastructure; amendments to the car and cycle parking provision; other associated access and landscape works and varying the legal obligation… Data via plota.co.uk

View original council record ↗

Application progress

Received
19 Jun 2026
Consultation
10 Jul 2026
Decision
Awaiting decision

This application is under consideration - no decision has been issued yet. The consultation period closed on 31 Jul 2026.

Documents 81

Statements & assessments 19

PDF UPDATED PILING METHOD STATEMENT Supporting Documentation · 30 Jul 2026 View ↗ PDF ORP-HGP-ZZ-00-D-A-7500-SITEWIDE REFUSE STRATEGY Transport Assessment · 19 Jun 2026 View ↗ PDF ORP-OCS-XX-XX-D-C-500 - BELOW GROUND DRAINAGE PLAN Flood Risk Assessment · 19 Jun 2026 View ↗ PDF ORP-OCS-XX-XX-D-C-501 - BELOW GROUND DRAINAGE PLAN Flood Risk Assessment · 19 Jun 2026 View ↗ PDF ORP-STR-XX-XX-T-O-1004-DAYLIGHT SUNLIGHT ASSESSMENT Daylight Assessment · 19 Jun 2026 View ↗ PDF ORP-HGP-ZZ-XX-T-A-9000-DESIGN AND ACCESS STATEMENT (ADDENDUM)_PART1 Design and Access Statement · 19 Jun 2026 View ↗ PDF ORP-HGP-ZZ-XX-T-A-9000-DESIGN AND ACCESS STATEMENT (ADDENDUM)_PART2 Design and Access Statement · 19 Jun 2026 View ↗ PDF ORP-HGP-ZZ-XX-T-A-9000-DESIGN AND ACCESS STATEMENT (ADDENDUM)_PART3 Design and Access Statement · 19 Jun 2026 View ↗ PDF ORP-HGP-ZZ-XX-T-A-9000-DESIGN AND ACCESS STATEMENT (ADDENDUM)_PART4 Design and Access Statement · 19 Jun 2026 View ↗ PDF H712-OCSC-LT-EK-01 - ORION PARK - DRAINAGE STATEMENT ADDENDUM_PART1 Flood Risk Assessment · 19 Jun 2026 View ↗ PDF H712-OCSC-LT-EK-01 - ORION PARK - DRAINAGE STATEMENT ADDENDUM_PART2 Flood Risk Assessment · 19 Jun 2026 View ↗ PDF ORP-TSL-XX-XX-T-O-1001-PRELIMINARY ECOLOGICAL APPRAISAL Drawing · 19 Jun 2026 View ↗ PDF ORP-STR-XX-XX-T-O-1003 - ENERGY STATMENT_R Sustainability Appraisal · 19 Jun 2026 View ↗ PDF ORP-STR-XX-XX-T-O-1002 - FACADE SOUND INSLUATION ASSESMENT Noise Impact Assessment · 19 Jun 2026 View ↗ PDF H712-OCSC-LT-EK-02 - ORION PARK - FRA COMPLIANCE STATEMENT Flood Risk Assessment · 19 Jun 2026 View ↗ PDF ORP-MOD-XX-XX-T-H-0001- TRANSPORT ASSESSMENT ADDENDUM Transport Assessment · 19 Jun 2026 View ↗ PDF SNG ORION PARK SCI - JUNE 2026 Statement of Community Involvement · 19 Jun 2026 View ↗ PDF 260619 - AMENDMENTS COVERING LETTER (FINAL) Planning Statement · 19 Jun 2026 View ↗ PDF 260619 - ORION PARK - ADDENDUM PLANNING STATEMENT (FINAL APP) Planning Statement · 19 Jun 2026 View ↗

Plans & drawings 45

PDF ORP-HGP-ZZ-XX-L-A-1100-ACCOMMODATION SCHEDULE Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-AA-XX-D-A-3000-BLOCK A ELEVATIONS SHEET 1 Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-AA-XX-D-A-3001-BLOCK A ELEVATIONS SHEET 2 Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-DD-XX-D-A-3005-BLOCK D ELEVATIONS SHEET 1 Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-DD-XX-D-A-3006-BLOCK D ELEVATIONS SHEET 2 Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-ZZ-XX-D-A-3007-SITEWIDE ELEVATIONS Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-DD-00-D-A-2002-BLOCK D GROUND FLOOR PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-DD-01-D-A-2012-BLOCK D FIRST FLOOR PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-DD-02-D-A-2022-BLOCK D SECOND FLOOR PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-DD-03-D-A-2032-BLOCK D THIRD FLOOR PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-DD-04-D-A-2042-BLOCK D FOURTH FLOOR PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-AA-00-D-A-2003-BLOCK A UPPER GROUND FLOOR PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-AA-01-D-A-2010-BLOCK A FIRST FLOOR PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-AA-02-D-A-2020-BLOCK A SECOND FLOOR PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-AA-03-D-A-2030-BLOCK A THIRD FLOOR PLAN Draw - Prop Roof Plan · 19 Jun 2026 View ↗ PDF ORP-HGP-AA-04-D-A-2040-BLOCK A FOURTH FLOOR PLAN Draw - Prop Roof Plan · 19 Jun 2026 View ↗ PDF ORP-HGP-AA-B1-D-A-2000-BLOCK A LOWER GROUND FLOOR PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-AA-B1-D-A-7501-BLOCK A REFUSE STRATEGY Site Waste Management Plan · 19 Jun 2026 View ↗ PDF ORP-HGP-DD-00-D-A-7503-BLOCK D REFUSE STRATEGY Site Waste Management Plan · 19 Jun 2026 View ↗ PDF ORP-HGP-ZZ-06-D-A-1060-ROOF LEVEL SITE PLAN Draw - Prop Roof Plan · 19 Jun 2026 View ↗ PDF ORP-HGP-AA-05-D-A-2500-BLOCK A ROOF PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-DD-05-D-A-2502-BLOCK D ROOF PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-AA-XX-D-A-3500-BLOCK A SECTIONS Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-BB-XX-D-A-3501-BLOCK B SECTIONS Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-CC-XX-D-A-3502-BLOCK C SECTIONS Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-DD-XX-D-A-3503-BLOCK D SECTIONS Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-ZZ-XX-D-A-3510-SITE SECTIONS Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-ZZ-00-D-A-1000-LOWER GROUND - GROUND FLOOR SITE PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-ZZ-01-D-A-1010-UPPER GROUND - FIRST FLOOR SITE PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-ZZ-02-D-A-1020-SECOND FLOOR SITE PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-ZZ-03-D-A-1030-THIRD FLOOR SITE PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-ZZ-04-D-A-1040-FOURTH FLOOR SITE PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-HGP-ZZ-05-D-A-1050-FIFTH FLOOR SITE PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-BPTW-13-00-DR-A-0101-C01-A3 Drawing · 19 Jun 2026 View ↗ PDF ORP-BPTW-14-00-DR-A-0103-C01-A3 Drawing · 19 Jun 2026 View ↗ PDF ORP-BPTW-14-B1-DR-A-0102-C01-A3 Drawing · 19 Jun 2026 View ↗ PDF ORP-BPTW-14-ZZ-DR-A-2001-C01-A3 Drawing · 19 Jun 2026 View ↗ PDF ORP-AMF-XX-XX-T-Z-0003-HEATING VENTILATION STRATEGY Drawing · 19 Jun 2026 View ↗ PDF ORP-STR-XX-XX-T-O-1001 - OVERHEATING REPORT Drawing · 19 Jun 2026 View ↗ PDF ORP-OCS-ZZ-FN-D-S-1100-S1-P01-BLOCK BC FOUNDATION PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-OCS-AA-FN-D-S-0999-S0-P02-BLOCK A PILING LAYOUT Draw - Exist Layout Plan · 19 Jun 2026 View ↗ PDF ORP-OCS-AA-FN-D-S-1000-S0-P01-BLOCK A FOUNDATION PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-OCS-DD-FN-D-S-1199-S0-P02-BLOCK D PILING LAYOUT Drawing · 19 Jun 2026 View ↗ PDF ORP-OCS-DD-FN-D-S-1200-S1-P02-BLOCK D FOUNDATION PLAN Drawing · 19 Jun 2026 View ↗ PDF ORP-OCS-ZZ-FN-D-S-1099-S0-P02-BLOCK BC PILING LAYOUT Draw - Exist Layout Plan · 19 Jun 2026 View ↗

Other documents 16

All documents on the council site ↗

Work with planning data? Every application in Ealing - and every UK council - as a live feed or API. About Plota's data service

Important details

Council
Ealing
Application type
Variation of Condition
Postcode
W13 9SJ
Received
19 Jun 2026
Validated
19 Jun 2026
Ward
Northfield
Case officer
Show
Target decision
18 Sept 2026
Agent
Stantec UK Limited

Public comments

69comments received
66 objecting2 neutral1 supporting

96% object · above the UK average of 76%

Last counted 19 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14989299
Consultation
10 Jul 2026
Comments by
31 Jul 2026
Press notice
22 Jul 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision performance
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026