Burtree Garden Village Phase 1 Burtree Lane Darlington Data via plota.co.uk

25/00785/CON - Discharge of Condition Awaiting decision

Proposal

Approval of details reserved by condition 49 (highways), 52 (vehicular parking), 54 (cycle parking), 55 (phasing plan), 60 (building height), 61 (floor levels), 62 (housing mix), 64 (EV charging), 65 (bat and bird boxes), 66 (external materials), 67 (housing mix M4(2) & M4 3a or b), 68 (play areas), 69 (broadband), 72 (noise assessment), 81 (SW drainage scheme), 82 (drainage scheme), 83 (SW drainage MP) 86 (Phase 2 SIS), 87 (Phase 2 SI report) and 88 (Phase 3 remediation strategy) attached to hybrid planning permission dated 31 Jan 2025 (Burtree Garden Village Phase 1) - (Cells E (in part), G and P (in part)) (amended plans and documents received 15 August 2025; amended and additional noise mitigation plan and measures received 22 August 2025; Additional Materials information received 19 September 2025; amended bat and bird box plan received 2 October 2025) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Jul 2025
✓
Consultation
3 Oct 2025
Decision
Target date was 19 Sept 2025

Under consideration

No decision has been issued yet. A decision is expected by 19 Sept 2025.

The consultation period closed on 24 Oct 2025.

Documents 67

Plans & drawings 23

PDF 107 P4 BIRD AND BAT BOX LOCATIONS Drawing Superseded · 18 Aug 2025 View ↗ PDF 24130 - 001 - T6 ENGINEERING LAYOUT SHEET 1 Drawing Superseded · 25 Jul 2025 View ↗ PDF 24130 - 002 - T6 ENGINEERING LAYOUT SHEET 2 Drawing Superseded · 25 Jul 2025 View ↗ PDF 24130 - 003 - T6 ENGINEERING LAYOUT SHEET 3 Drawing Superseded · 25 Jul 2025 View ↗ PDF 24130 - 061 - T6 SECTION 38 SHEET 1 OF 2 Drawing Superseded · 25 Jul 2025 View ↗ PDF 24130 - 062 - T6 SECTION 38 SHEET 2 OF 2 Drawing Superseded · 25 Jul 2025 View ↗ PDF 24130 - 081 - T5 EXTERNAL WORKS SHEET 1 OF 3 Drawing Superseded · 25 Jul 2025 View ↗ PDF 24130 - 082 - T5 EXTERNAL WORKS SHEET 2 OF 3 Drawing Superseded · 25 Jul 2025 View ↗ PDF 24130 - 083 - T5 EXTERNAL WORKS SHEET 3 OF 3 Drawing Superseded · 25 Jul 2025 View ↗ PDF 24130 - 111 - T6 SWEPT PATH ANALYSIS Drawing Superseded · 25 Jul 2025 View ↗ PDF 100 P5 PROPOSED SITE LAYOUT Drawing Superseded · 25 Jul 2025 View ↗ PDF 118 P2 SPOT HEIGHTS PLAN Drawing Superseded · 25 Jul 2025 View ↗ PDF 104 P4 EV LAYOUT Drawing Superseded · 25 Jul 2025 View ↗ PDF 107 P3 BIRD AND BAT BOX LOCATIONS Drawing Superseded · 25 Jul 2025 View ↗ PDF 103 P5 EXTERNAL FINISHES PLAN Drawing Superseded · 25 Jul 2025 View ↗ PDF 106 P3 M4(2) AND M4(3) COMPLIANCE PLAN Drawing Superseded · 25 Jul 2025 View ↗ PDF 24130 - 071 - T4 SECTION 104 SHEET 1 OF 2 VER3 Drawing Superseded · 25 Jul 2025 View ↗ PDF 24130 - 072 - T4 SECTION 104 SHEET 2 OF 2 VER3 Drawing Superseded · 25 Jul 2025 View ↗ PDF P1 HOUSETYPE BOOKLET (1 OF 4) Drawing Superseded · 25 Jul 2025 View ↗ PDF P1 HOUSETYPE BOOKLET (2 OF 4) Drawing Superseded · 25 Jul 2025 View ↗ PDF P1 HOUSETYPE BOOKLET (3 OF 4) Drawing Superseded · 25 Jul 2025 View ↗ PDF P1 HOUSETYPE BOOKLET (4 OF 4) Drawing Superseded · 25 Jul 2025 View ↗ PDF THORNTON V1 Drawing Superseded · 25 Jul 2025 View ↗

All documents on the council site ↗

Site constraints 2

Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3a, surveyed
Best and most versatile land (grades 1, 2 and 3a). Source: Natural England's post-1988 ALC field survey (Leeds). Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Survey report ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 15 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Darlington - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Darlington
Application type
Discharge of Condition
Received
25 Jul 2025
Validated
25 Jul 2025
Ward
Harrowgate Hill
Parish
Whessoe Parish Council
Case officer
Show
Target decision
19 Sept 2025
Applicant
Show

Public comments

No public comments yet.

Last counted 22 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-13977628
Planning Portal ref
PP-13977628
Consultation
3 Oct 2025
Comments by
24 Oct 2025
Statutory expiry
19 Sept 2025
Env. assessment
No
Darlington
Planning Authority Score
7.5/10
Good
#43 of 296 councils
Relevant to this application:
Householder decisions

Darlington ranks #137 out of 296 councils for householder decision speed. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Darlington decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #109 of 296
98%
Householder approved
Above avg (90%) #14 of 296
67%
Decided in 8 weeks
Above avg (63%) #137 of 296
33%
Extended time limit
Below avg (41%) #73 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
76%
Change of use approved
25 decided
465
Total decisions
46 refused in the year to March 2026