Moat Farm Moat Lane Staunton Gloucester Gloucestershire GL19 3QG Data via plota.co.uk

P0131/26/LBC - Listed Building Consent Approved

Proposal

Listed Building Consent for replacement roof, windows and door, and erection of a rear canopy above double doors Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
3 Feb 2026
Validated
17 Mar 2026
Consultation
12 May 2026
Approved
8 Jun 2026

Approved on 8 Jun 2026 · Delegated Decision · Last checked 5 Jul 2026

Documents 21

All documents on the council site ↗

Associated applications 2

Site constraints 4

Grade II listed: Moat Farmhouse
List entry 1078468 · 1 m from the pin
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Staunton/Corse Conservation Area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Forest of Dean - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
GL19 3QG
Received
3 Feb 2026
Validated
17 Mar 2026
Ward
Hartpury & Redmarley
Parish
Staunton (N)
Case officer
Show
Target decision
12 May 2026
Decision
Granted Permission
Decision date
8 Jun 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Meraki Architecture Limited

How this decision compares

Decided in 83 days from validation, 29 days slower than Forest of Dean's median of 54 for listed building consent. Approved, as 100% of listed building consent here are.

67%decided within 8 weeks
100%approved
27decided in the last year

Plota live figures for listed building consent decided by Forest of Dean in the last twelve months, from validation. Forest of Dean decision record →

Consultation & key dates

Alt. reference
DF6729
Consultation
12 May 2026
Site or press notice
2 Apr 2026
Env. assessment
No
Forest of Dean
Planning Authority Score
5.7/10
Average
#114 of 296 councils
Relevant to this application:
Other decisions

Forest of Dean ranks #149 out of 296 councils for householder decision speed. 49% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Forest of Dean decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #82 of 296
98%
Householder approved
Above avg (90%) #16 of 296
64%
Decided in 8 weeks
Above avg (63%) #149 of 296
49%
Extended time limit
Above avg (41%) #219 of 296
72%
Minor dwellings approved
85 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
89%
Change of use approved
9 decided
561
Total decisions
43 refused in the year to March 2026