32 Banks Road, West Kirby, Wirral, CH48 0RD Data via plota.co.uk

APP/26/00558 - Full Planning Permission Pending Consideration

Proposal

Installation of a single storey detached office pod within the existing enclosed courtyard of the Gather & Graze premises Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Apr 2026
✓
Validated
19 Aug 2026
Decision
Expected by 28 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 1 Dec 2026 and 27 Dec 2026, from Wirral's recent commercial and major works.

The consultation period closed on 10 Sept 2026.

Documents 10

Statements & assessments 3

PDF Commenter’s name hidden Show Application Submission Details - Public · 21 May 2026 View ↗
PDF Commenter’s name hidden Show Application Submission Details - Public · 21 May 2026 View ↗
PDF Commenter’s name hidden Show Application Submission Details - Public · 21 May 2026 View ↗

Plans & drawings 2

PDF Commenter’s name hidden Show Revised Drawing - Public · 19 Aug 2026 View ↗
PDF Commenter’s name hidden Show OneApp Attachments - Public · 16 Apr 2026 View ↗

Application forms 1

PDF Commenter’s name hidden Show Revised Document (Public) · 21 May 2026 View ↗

Other documents 4

PDF Commenter’s name hidden Show OneApp Attachments - Public · 16 Apr 2026 View ↗
PDF 20260413_142735.jpg OneApp Attachments - Public · 16 Apr 2026 View ↗ PDF 20260413_142809.jpg OneApp Attachments - Public · 16 Apr 2026 View ↗
PDF Commenter’s name hidden Show OneApp Attachments - Public · 16 Apr 2026 View ↗

All documents on the council site ↗

Site constraints 6

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Special area of conservation 262 m away: Dee Estuary
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
SSSI 262 m away: Dee Estuary SSSI; 1 listed building within 150 m; Inside the West Kirby built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area69 m² (743 sq ft)
Energy ratingC (asset rating 58)
UseRestaurants and Cafes/Drinking Establishments/Takeaways
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in September 2025, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Wirral - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wirral
Application type
Full Planning Permission
Postcode
CH48 0RD
Received
15 Apr 2026
Validated
19 Aug 2026
Ward
Hoylake and Meols
Case officer
Show
Target decision
28 Oct 2026
Decision level
Delegated
Applicant
Show

Decision outlook

Day 51 of the 56-day target. Wirral usually decides commercial and major works by day 112.

Day 5161 days to the predicted decision (day 112)
19%decided within 8 weeks
95%approved
8%go to committee

Plota live figures for commercial and major works decided by Wirral in the last twelve months, from validation. Wirral decision record →

Consultation & key dates

Comments by
10 Sept 2026
Statutory expiry
28 Oct 2026
Wirral
Planning Authority Score
3.3/10
Poor
#227 of 296 councils
Relevant to this application:
Householder decisions

Wirral is slower than most councils at deciding householder applications, ranking #200 out of 296. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Wirral decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #164 of 296
90%
Householder approved
Above avg (90%) #198 of 296
57%
Decided in 8 weeks
Below avg (63%) #200 of 296
45%
Extended time limit
Above avg (41%) #197 of 296
62%
Minor dwellings approved
47 decided (1-9 homes)
86%
Major dwellings approved
7 decided (10+ homes)
77%
Change of use approved
61 decided
909
Total decisions
112 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.