The Pier Western Esplanade Southend-on-sea Essex Data via plota.co.uk

26/01081/LBC - Listed Building Consent Registered

Proposal

Timber repairs and protective works to Old Pier Head and Outer Pier Head of Southend Pier (Listed Building Consent) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Aug 2026
Decision
Expected by 6 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision by 7 Nov 2026, from Southend's recent listed building consent.

Site constraints 9

Tilbury to Southend across the site
Matters where it crosses or adjoins the site; the route and its margin are protected.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Ramsar wetland 107 m away: Outer Thames Estuary
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 118 m away: Benfleet and Southend Marshes SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Registered park or garden 100 m away: Shrubbery Garden
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Also on the record
Conservation area 26 m away: Clifftown Conservation Area; 3 listed buildings within 150 m; Inside the Southend-on-Sea built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southend - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southend
Application type
Listed Building Consent
Postcode
SS1 2EH
Received
12 Aug 2026
Validated
12 Aug 2026
Ward
Milton
Case officer
Show
Target decision
6 Nov 2026
Decision level
Delegated
Applicant
Show
Agent
Stantec UK Ltd

Decision outlook

Day 68 of the 56-day target. Southend usually decides listed building consent by day 86.

Day 6818 days to the predicted decision (day 86)
36%decided within 8 weeks
91%approved
11decided in the last year

Plota live figures for listed building consent decided by Southend in the last twelve months, from validation. Southend decision record →

Public comments

No public comments yet.

20 neighbours consulted · Last counted 15 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
7 Oct 2026
Env. assessment
No
Southend
Planning Authority Score
3.8/10
Below average
#209 of 296 councils
Relevant to this application:
Other decisions

Southend ranks #155 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southend decision statistics
Based on MHCLG data, the year to March 2026
80%
Overall approval rate
Below avg (87%) #261 of 296
88%
Householder approved
Below avg (90%) #224 of 296
64%
Decided in 8 weeks
Above avg (63%) #155 of 296
43%
Extended time limit
Above avg (41%) #173 of 296
62%
Minor dwellings approved
109 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
56%
Change of use approved
82 decided
904
Total decisions
177 refused in the year to March 2026