Seaview Holiday Park The Lodge Sennen Cornwall TR19 7AD Data via plota.co.uk

PA26/06196 - Permission in Principle Awaiting decision

Proposal

Application for Permission in Principle for the construction of up to 1 dwelling (minimum of 1, maximum of 1) Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
7 Sept 2026
Decision
Expected by 12 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 1 Nov 2026, from Cornwall's recent new homes.

Site constraints 6

Heritage coast: Penwith
A defined stretch of undeveloped coastline.
Development inconsistent with keeping the coast undeveloped is resisted.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National landscape 83 m away: Cornwall
Outside the landscape; its setting can still be raised.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Also on the record
Scheduled monument 176 m away: Trevescan Cross 340m SSW of Sennen Church; 2 listed buildings within 150 m.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cornwall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cornwall
Application type
Permission in Principle
Postcode
TR19 7AD
Received
7 Sept 2026
Validated
7 Sept 2026
Ward
Land's End
Parish
Sennen
Case officer
Show
Target decision
12 Oct 2026
Applicant
Show
Agent
DPC Architectural Services

Decision outlook

Day 7 of the 56-day target. Cornwall usually decides new homes by day 55.

Day 749 days to the 56-day target
71%decided within 8 weeks
91%approved
100%go to committee

Plota live figures for new homes decided by Cornwall in the last twelve months, from validation. Cornwall decision record →

Public comments

No public comments yet.

Last counted 9 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15202331
Statutory expiry
12 Oct 2026
Env. assessment
No
Cornwall
Planning Authority Score
7.9/10
Good
#28 of 296 councils
Relevant to this application:
Householder decisions

Cornwall is faster than most councils at deciding householder applications, ranking #64 out of 296. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Cornwall decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #79 of 296
97%
Householder approved
Above avg (90%) #28 of 296
76%
Decided in 8 weeks
Above avg (63%) #64 of 296
35%
Extended time limit
Below avg (41%) #101 of 296
82%
Minor dwellings approved
1180 decided (1-9 homes)
94%
Major dwellings approved
67 decided (10+ homes)
93%
Change of use approved
194 decided
4,839
Total decisions
363 refused in the year to March 2026