Premier Inn Colchester Road Boreham Chelmsford Essex CM2 5PY Data via plota.co.uk

26/00426/FUL Approved

Proposal

Development comprising of an Air Conditioning Compound and Plant Equipment. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Apr 2026
✓
Approved
3 Jun 2026

Approved on 3 Jun 2026 · Last checked 20 Sept 2026

Site constraints 3

National infrastructure project about 47 m away: A12 Chelmsford to A120 Widening Scheme
The site is about 47 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Longfield Solar Farm (decided, about 510 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Chelmsford built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Chelmsford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Chelmsford
Postcode
CM2 5PY
Received
9 Apr 2026
Validated
9 Apr 2026
Target decision
4 Jun 2026
Decision date
3 Jun 2026

How this decision compares

Decided in 55 days from validation, about the council's usual 56 days. Approved, as 81% of utility and infrastructure works here are.

58%decided within 8 weeks
81%approved
28decided in the last year

Plota live figures for utility and infrastructure works decided by Chelmsford in the last twelve months, from validation. Chelmsford decision record →

Public comments

No public comments yet.

Last counted 20 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14760830
Planning Portal ref
PP-14760830
Comments by
27 May 2026
Chelmsford
Planning Authority Score
7.4/10
Good
#45 of 296 councils
Relevant to this application:
Householder decisions

Chelmsford is one of the fastest councils in England for householder decisions, ranking #23 out of 296. Only 21% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Chelmsford decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #167 of 296
90%
Householder approved
Above avg (90%) #188 of 296
84%
Decided in 8 weeks
Above avg (63%) #23 of 296
21%
Extended time limit
Below avg (41%) #19 of 296
76%
Minor dwellings approved
164 decided (1-9 homes)
88%
Major dwellings approved
8 decided (10+ homes)
79%
Change of use approved
52 decided
1,304
Total decisions
168 refused in the year to March 2026