Land near Unit 1, Llwyn yr Eos, Parc Menter, Cross Hands, Llanelli, SA14 6RA Data via plota.co.uk

PL/11408 - Full planning permission Under Consultation

Proposal

Construction and operation of a low voltage battery energy storage facility Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Sept 2026
✓
Validated
2 Oct 2026
Decision
Expected by 27 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 3 Dec 2026 and 26 Dec 2026, from Carmarthenshire's recent full applications.

Comments are open until 3 Nov 2026

Comment on this application ↗

Site constraints 5

Agricultural land, grade 5
Very poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Special area of conservation 383 m away: Caeau Mynydd Mawr; Radon affected area, class 2; SSSI 383 m away: Caeau Ffos Fach; Coalfield, development low risk area.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 9 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Carmarthenshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full planning permission
Postcode
SA14 6RA
Received
11 Sept 2026
Validated
2 Oct 2026
Ward
Llannon
Parish
Llannon
Case officer
Show
Target decision
27 Nov 2026

Decision outlook

Day 26 of the 56-day target. Carmarthenshire usually decides full applications by day 75.

Day 2649 days to the predicted decision (day 75)
36%decided within 8 weeks
78%approved
393decided in the last year

Plota live figures for full applications decided by Carmarthenshire in the last twelve months, from validation. Carmarthenshire decision record →

Consultation & key dates

Comments by
3 Nov 2026