Land At Princes Jetty Princes Dock, Liverpool Waters, Liverpool, L3 Data via plota.co.uk

26L/2397 - Listed Building Consent Consultation Complete

Proposal

To carry out disengagement from river wall of timber jetty and associated wharves known as Princes Jetty, demolition of the jetty and wharves and making good areas where the existing structure is tied into the river wall. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Aug 2026
✓
Validated
14 Sept 2026
Decision
Expected by 9 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 9 Nov 2026 and 11 Dec 2026, from Liverpool's recent demolitions.

Site constraints 10

Article 4 direction
The Liverpool (Anfield, Central, Greenbank, Kensington and Fairfield, Picton, Princess Park, Riverside, Tuebrook and Stoneycroft and Wavertree wards and parts of Kirkdale and Church wards) (Article 4(. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Special protection area 45 m away: Liverpool Bay
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Air quality management area: Liverpool City AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
World heritage site 44 m away: Liverpool - Maritime Mercantile City
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Also on the record
Conservation area 42 m away: Castle Street; National infrastructure project: Mersey Tidal Power Project, at pre-application; 1 listed building within 150 m; Inside the Liverpool built-up area; Flood defence 41 m away (natural high ground, designed for a 1 in 5 year flood).
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Liverpool - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Liverpool
Application type
Listed Building Consent
Received
24 Aug 2026
Validated
14 Sept 2026
Case officer
Show
Target decision
9 Nov 2026
Applicant
Show
Agent
Cassidy + Ashton Group Ltd

Decision outlook

Day 44 of the 56-day target. Liverpool usually decides demolitions by day 68.

Day 4424 days to the predicted decision (day 68)
46%decided within 8 weeks
85%approved
6%go to committee

Plota live figures for demolitions decided by Liverpool in the last twelve months, from validation. Liverpool decision record →

Consultation & key dates

Statutory expiry
9 Nov 2026
Liverpool
Planning Authority Score
4.8/10
Below average
#160 of 296 councils
Relevant to this application:
Other decisions

Liverpool ranks #165 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Liverpool decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #209 of 296
92%
Householder approved
Above avg (90%) #157 of 296
62%
Decided in 8 weeks
Below avg (63%) #165 of 296
39%
Extended time limit
Below avg (41%) #138 of 296
68%
Minor dwellings approved
47 decided (1-9 homes)
82%
Major dwellings approved
17 decided (10+ homes)
61%
Change of use approved
195 decided
1,478
Total decisions
222 refused in the year to March 2026