Units 3 and 4 Lower William Street Southampton SO14 5QE Data via plota.co.uk

Proposal

Change of use to indoor sport and fitness (Class E(d)) [Departure from Local Plan] Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Aug 2026
✓
Consultation
17 Aug 2026
Decision
Expected by 30 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 65.

The consultation period closed on 7 Sept 2026.

Site constraints 7

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Article 4 direction
HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Special protection area 106 m away: Solent and Dorset Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
SSSI 340 m away: Lee-on-The Solent to Itchen Estuary SSSI; Inside the Southampton built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southampton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
SO14 5QE
Received
5 Aug 2026
Validated
5 Aug 2026
Ward
Bevois
Case officer
Show
Target decision
30 Sept 2026
Applicant
Show
Agent
Boyle & Summers Ltd

Decision outlook

Day 65, past the statutory target. 82% of changes of use in Southampton are decided within thirteen weeks, which runs to 4 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 659 days past the 56-day target
50%decided within 8 weeks
86%approved
11%go to committee

Plota live figures for changes of use decided by Southampton in the last twelve months, from validation. Southampton decision record →

Public comments

1comment received
1 objecting

11 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
1066
Neighbours
17 Aug 2026
Consultation
17 Aug 2026
Comments by
7 Sept 2026
Statutory expiry
30 Sept 2026
Env. assessment
No
Southampton
Planning Authority Score
5/10
Average
#150 of 296 councils
Relevant to this application:
Change of use

Southampton ranks #158 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southampton decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #117 of 296
93%
Householder approved
Above avg (90%) #137 of 296
63%
Decided in 8 weeks
Above avg (63%) #158 of 296
40%
Extended time limit
Below avg (41%) #154 of 296
70%
Minor dwellings approved
50 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
86%
Change of use approved
109 decided
742
Total decisions
72 refused in the year to March 2026