Timber Centre Outgang Lane Dinnington Data via plota.co.uk

Proposal

Change of use to to a commercial vehicle sales, servicing, repair and inspection facility (sui generis), including ancillary storage, offices, vehicle washing and valeting, vehicle display, parking and associated works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Oct 2026
Decision
Expected by 7 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 4 Dec 2026, from Rotherham's recent changes of use.

Site constraints 7

Surface water flood risk
Green belt: South and West Yorkshire
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Open access land
Open country or registered common land, with a right to roam on foot.
Building on registered common land needs the consent of the Secretary of State as well as planning permission.
Surface water flood riskCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
National infrastructure project about 1706 m away: Whitestone Solar Farm; Coalfield, development low risk area; Priority habitat about 30 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 20 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rotherham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rotherham
Received
12 Oct 2026
Ward
Dinnington Ward
Parish
Dinnington St John's
Case officer
Show
Decision level
Proposed to be Delegated
Applicant
Show
Agent
UKSD Developments

Decision outlook

Day 16 of the 56-day target. Rotherham usually decides changes of use by day 53.

Day 1640 days to the 56-day target
62%decided within 8 weeks
86%approved
6%go to committee

Plota live figures for changes of use decided by Rotherham in the last twelve months, from validation. Rotherham decision record →

Consultation & key dates

Statutory expiry
11 Dec 2026
Rotherham
Planning Authority Score
4.7/10
Below average
#167 of 296 councils
Relevant to this application:
Change of use

Rotherham ranks #107 out of 296 councils for householder decision speed. Rotherham is also one of the strictest councils - it refuses more householder applications than almost any other, with only 71% approved vs 90% nationally.

One of the strictest councils
only 71% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Rotherham decision statistics
Based on MHCLG data, the year to March 2026
79%
Overall approval rate
Below avg (87%) #266 of 296
71%
Householder approved
Below avg (90%) #295 of 296
72%
Decided in 8 weeks
Above avg (63%) #107 of 296
32%
Extended time limit
Below avg (41%) #68 of 296
78%
Minor dwellings approved
63 decided (1-9 homes)
100%
Major dwellings approved
20 decided (10+ homes)
83%
Change of use approved
58 decided
750
Total decisions
156 refused in the year to March 2026