23 - 31 St Ronans Road Southsea PO4 0PP Data via plota.co.uk

25/01114/FUL - Full Application Approved

Proposal

Retrospective planning for installation of kitchen extract and ducting and proposed installation of screening. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Sept 2025
✓
Validated
25 Sept 2025
✓
Consultation
7 Oct 2025
✓
Approved
22 Sept 2026

Approved on 22 Sept 2026 · Fully Delegated Decision · Last checked 12 Oct 2026

Associated applications 2

Site constraints 5

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Also on the record
Conservation area 67 m away: Craneswater and Eastern Parade, Southsea; National infrastructure project 1955 m away: AQUIND Interconnector; Inside the Portsmouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 12 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Full Application
Postcode
PO4 0PP
Received
24 Sept 2025
Validated
25 Sept 2025
Ward
Eastney & Craneswater
Target decision
25 Sept 2026
Decision
Conditional Approval
Decision date
22 Sept 2026
Decision level
Fully Delegated Decision
Applicant
Show
Agent
JB Architecture Design

How this decision compares

Decided in 362 days from validation, 287 days slower than Portsmouth's median of 75 for full applications. Approved, as 79% of full applications here are.

37%decided within 8 weeks
79%approved
17%go to committee

Plota live figures for full applications decided by Portsmouth in the last twelve months, from validation. Portsmouth decision record →

Public comments

2comments received
2 neutral

19 neighbours consulted · Last counted 12 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14309177
Planning Portal ref
PP-14309177
Neighbours
7 Oct 2025
Consultation
7 Oct 2025
Comments by
31 Oct 2025
Site or press notice
9 Oct 2025
Statutory expiry
20 Nov 2025
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 councils
Relevant to this application:
Householder decisions

Portsmouth ranks #188 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026