Waterbeach Barracks And Airfield, Key Phase 1, Parcels 6.1, 6.2, 7.1, 7.2. Data via plota.co.uk

26/02870/REM - Approval of Reserved Matters Approved

Proposal

Reserved matters approval (appearance, access, landscaping, layout and scale) for the development of four blocks comprising 387 Build to Rent (BtR) dwellings with associated resident amenity areas (Use Class C3) and 482 sq.m (GEA) of flexible commercial floorspace (Use Class E), areas of open space and public realm including a Lakeside Promenade and Civic Plaza, cycle storage, waste storage and substation buildings and all associated infrastructure including: access junctions, access/internal roads, parking, utilities infrastructure including alignment of service runs, foul and surface water drainage infrastructure, roof mounted solar panels, green roofs, street lighting, external hard landscaping, soft landscaping and planting, ecological mitigation, footways / cycleways, car and cycle parking, boundary treatments, street furniture, lake-edge engineering works, any necessary temporary stockpiling of construction materials, areas for construction use, land reprofiling, temporary haul routes and any necessary demolition at Parcels 6.1, 6.2, 7.1 and 7.2 at Key Phase 1 of the Waterbeach Barracks and Airfield development pursuant to Condition 3 of the outline planning consent ref: (Environmental Impact Assessment application with Environmental Statement) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Jul 2026
✓
Consultation
6 Aug 2026
✓
Approved
26 Oct 2026

Approved on 26 Oct 2026 · Delegated Decision · Last checked 27 Oct 2026

Documents 53

Statements & assessments 22

PDF SUSTAINABILITY Consultee Comments · 19 Oct 2026 View ↗ PDF ECOLOGY Consultee Comments · 15 Oct 2026 View ↗ PDF LOCAL LEAD FLOOD AUTHORITY Consultee Comments · 18 Sept 2026 View ↗ PDF COUNTY TRAVEL ASSESSMENT COMMENTS Consultee Comments · 27 Aug 2026 View ↗ PDF ECOLOGY Consultee Comments · 26 Aug 2026 View ↗ PDF SUSTAINABILITY Consultee Comments · 19 Aug 2026 View ↗ PDF DESIGN & ACCESS STATEMENT PART1 Design and Access Statement · 29 Jul 2026 View ↗ PDF DESIGN & ACCESS STATEMENT PART 10 Design and Access Statement · 29 Jul 2026 View ↗ PDF DESIGN & ACCESS STATEMENT PART 11 Design and Access Statement · 29 Jul 2026 View ↗ PDF DESIGN & ACCESS STATEMENT PART 2 Design and Access Statement · 29 Jul 2026 View ↗ PDF DESIGN & ACCESS STATEMENT PART 3 Design and Access Statement · 29 Jul 2026 View ↗ PDF DESIGN & ACCESS STATEMENT PART 4 Design and Access Statement · 29 Jul 2026 View ↗ PDF DESIGN & ACCESS STATEMENT PART 5 Design and Access Statement · 29 Jul 2026 View ↗ PDF DESIGN & ACCESS STATEMENT PART 6 Design and Access Statement · 29 Jul 2026 View ↗ PDF DESIGN & ACCESS STATEMENT PART 7 Design and Access Statement · 29 Jul 2026 View ↗ PDF DESIGN & ACCESS STATEMENT PART 8 Design and Access Statement · 29 Jul 2026 View ↗ PDF DESIGN & ACCESS STATEMENT PART9 Design and Access Statement · 29 Jul 2026 View ↗ PDF PLANNING DESIGN AND CONFORMITY STATEMENT Design and Access Statement · 29 Jul 2026 View ↗ PDF SUSTAINABILITY CONFORMITY STATEMENT Application Survey / Assessment / Statement · 29 Jul 2026 View ↗ PDF SOFT LANDSCAPE AND ECOLOGY SPECIFICATION AND SCHEDULES Application Information · 29 Jul 2026 View ↗ PDF ECOLOGICAL IMPLEMENTATION AND MITIGATIO PLAN Application Information · 29 Jul 2026 View ↗ PDF SURFACE WATER AND FOUL WATER DRAINAGE SCHEME Application Information · 29 Jul 2026 View ↗

All documents on the council site ↗

Associated applications 13

Site constraints 3

National infrastructure project 764 m away: Cambridge Waste Water Treatment Plant Relocation
The site is 764 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Waterbeach built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Cambridgeshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Reserved Matters
Postcode
CB25 9PA
Received
29 Jul 2026
Validated
29 Jul 2026
Ward
Milton & Waterbeach
Parish
Waterbeach CP
Case officer
Show
Target decision
28 Oct 2026
Decision
Granted Permission
Decision date
26 Oct 2026
Decision level
Delegated Decision
Agent
David Lock Associates

How this decision compares

Decided in 89 days from validation, 33 days slower than South Cambridgeshire's median of 56 for commercial and major works. Approved, as 93% of commercial and major works here are.

57%decided within 8 weeks
93%approved
49decided in the last year

Plota live figures for commercial and major works decided by South Cambridgeshire in the last twelve months, from validation. South Cambridgeshire decision record →

Public comments

2comments received
2 objecting

3 neighbours consulted · Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Site or press notice
6 Aug 2026
Statutory expiry
28 Oct 2026
Env. assessment
No
South Cambridgeshire
Planning Authority Score
8.1/10
Excellent
#25 of 296 councils
Relevant to this application:
Major dwellings

South Cambridgeshire is one of the fastest councils in England for householder decisions, ranking #24 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
South Cambridgeshire decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #45 of 296
95%
Householder approved
Above avg (90%) #91 of 296
84%
Decided in 8 weeks
Above avg (63%) #24 of 296
31%
Extended time limit
Below avg (41%) #60 of 296
86%
Minor dwellings approved
215 decided (1-9 homes)
96%
Major dwellings approved
27 decided (10+ homes)
79%
Change of use approved
38 decided
1,509
Total decisions
96 refused in the year to March 2026