Nashes Lodge Gorhambury St Albans Hertfordshire AL3 6AQ Data via plota.co.uk

5/2026/1088 - MAL Under Consideration

Proposal

Re-roofing, installation of loft insulation, replacement of rainwater goods and construction of new surface water drainage system (retrospective) Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
5 Jun 2026
Validated
8 Jun 2026
Decision
Expected by 25 Jul 2026

This application is under consideration - no decision has been issued yet. Plota predicted a decision around 14 Sept 2026; it is now day 98. The consultation period closed on 25 Jul 2026.

Site constraints 3

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm.
Registered park or garden: Gorhambury
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map, which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in St Albans - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
St Albans
Application type
MAL
Postcode
AL3 6AQ
Received
5 Jun 2026
Validated
8 Jun 2026
Ward
Verulam
Parish
ST MICHAEL
Case officer
Show
Target decision
25 Jul 2026
Applicant
Show

Decision outlook

Day 98, past the statutory target. 69% of extensions in St Albans are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 12 Sept 2026.

Day 9842 days past the 56-day target
30%decided within 8 weeks
84%approved
489decided in the last year

Plota live figures for extensions decided by St Albans in the last twelve months, from validation. St Albans decision record →

Consultation & key dates

Alt. reference
322103PLN
Planning Portal ref
14981967
Comments by
25 Jul 2026
Site or press notice
2 Jul 2026
Statutory expiry
2 Aug 2026
St Albans
Planning Authority Score
1.1/10
Poor
#290 of 296 councils
Relevant to this application:
Householder decisions

St Albans is one of the slowest councils in England for householder decisions, ranking #285 out of 296. The council extends the time limit on 64% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
St Albans decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #180 of 296
88%
Householder approved
Below avg (90%) #226 of 296
29%
Decided in 8 weeks
Below avg (63%) #285 of 296
64%
Extended time limit
Above avg (41%) #278 of 296
74%
Minor dwellings approved
130 decided (1-9 homes)
61%
Major dwellings approved
18 decided (10+ homes)
77%
Change of use approved
26 decided
1,411
Total decisions
184 refused in the year to March 2026