Lands opposite and NE of 48 Rostrevor Road, NW of 56 Rostrevor Road and 23m SW of Moygannon House, Warrenpoint Data via plota.co.uk

Proposal

Glamping site to include 7no. glamping pods, communal walkways, open space and associated parking Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 May 2026
✓
Validated
4 Jun 2026
Decision
Target date was 30 Jul 2026

Under consideration

No decision has been issued yet. Plota predicts a decision by 20 Dec 2026, from Newry Mourne Down's recent full applications.

The consultation period closed on 1 Jul 2026.

Site constraints 1

Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newry Mourne Down - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
BT34 3RU
Received
27 May 2026
Validated
4 Jun 2026
Ward
Rostrevor
Applicant
Show
Agent
Gravis Planning

Decision outlook

Day 146 of the 56-day target. Newry Mourne Down usually decides full applications by day 169.

Day 14623 days to the predicted decision (day 169)
9%decided within 8 weeks
99%approved
475decided in the last year

Plota live figures for full applications decided by Newry Mourne Down in the last twelve months, from validation. Newry Mourne Down decision record →

Consultation & key dates

Planning Portal ref
PP-14964723
Comments by
1 Jul 2026
Site or press notice
17 Jun 2026